Back to building

100-24 194 STREET— Violations & Issues

Loading chart data...

Top Violations

Flooring2
Paint/Plaster1
Pest Infestation1

Top 311 Complaints

UNSANITARY CONDITION1
Blocked Driveway1
Request Large Bulky Item Collection1
Class B - HazardousFIRST NO ACCESS TO RE- INSPECT VIOLATION

§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... APPROX 25 SQFT AT WALLS AND CEILING IN THE 1st BATHROOM FROM EAST AT SOUTH LOCATED AT APT 2FLOOR, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST

Apt: 2FLOOR

Mar 22, 2023
Class B - HazardousCERTIFICATION POSTPONMENT GRANTED

§ 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR AT CEILING IN THE 2nd BATHROOM FROM EAST AT SOUTH LOCATED AT APT 2FLOOR, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST

Apt: 2FLOOR

Mar 22, 2023
Class B - HazardousCERTIFICATION POSTPONMENT GRANTED

HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 2FLOOR, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST

Apt: 2FLOOR

Mar 22, 2023
Class B - HazardousCERTIFICATION POSTPONMENT GRANTED

§ 27-2005 ADMIN. CODE: PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC TILE AT WEST WALL IN THE 2nd BATHROOM FROM EAST AT SOUTH LOCATED AT APT 2FLOOR, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST

Apt: 2FLOOR

Mar 22, 2023
Advertisement