65 total · Page 1 of 4
Installation of suspended scaffold for facade work and/or inspection. Amend #4, added outrigger details
Installation of suspended scaffold for facade work and/or inspection. Amend #4, added outrigger details
Installation of suspended scaffold for facade work and/or inspection. Amend #4, added outrigger details
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
RENOVATION OF 20-STORY NYCHA BUILDING AS PART OF THE NYCHA PACT RENOVATION: INTERIOR RENOVATION OF EXISTING LOBBY, KITCHEN AND BATHROOM THROUGHOUT, INSTALLATION OF NEW ENTRY ASSEMBLE IN NEW LOCATION, REPLACE DOORS. NO CHANGES TO USE, EGRESS, OR OCCUPANCY.
RENOVATION OF 20-STORY NYCHA BUILDING AS PART OF THE NYCHA PACT RENOVATION: INTERIOR RENOVATION OF EXISTING LOBBY, KITCHEN AND BATHROOM THROUGHOUT, INSTALLATION OF NEW ENTRY ASSEMBLE IN NEW LOCATION, REPLACE DOORS. NO CHANGES TO USE, EGRESS, OR OCCUPANCY.
REMOVE THREE FUEL OIL TANKS.
RENOVATION OF 20-STORY NYCHA BUILDING AS PART OF THE NYCHA PACT RENOVATION: INTERIOR RENOVATION OF EXISTING LOBBY, KITCHEN AND BATHROOM THROUGHOUT, INSTALLATION OF NEW ENTRY ASSEMBLE IN NEW LOCATION, REPLACE DOORS. NO CHANGES TO USE, EGRESS, OR OCCUPANCY.
RENOVATION OF 20-STORY NYCHA BUILDING AS PART OF THE NYCHA PACT RENOVATION: INTERIOR RENOVATION OF EXISTING LOBBY, KITCHEN AND BATHROOM THROUGHOUT, INSTALLATION OF NEW ENTRY ASSEMBLE IN NEW LOCATION, REPLACE DOORS. NO CHANGES TO USE, EGRESS, OR OCCUPANCY.
RENOVATION OF 20-STORY NYCHA BUILDING AS PART OF THE NYCHA PACT RENOVATION: INTERIOR RENOVATION OF EXISTING LOBBY, KITCHEN AND BATHROOM THROUGHOUT, INSTALLATION OF NEW ENTRY ASSEMBLE IN NEW LOCATION, REPLACE DOORS. NO CHANGES TO USE, EGRESS, OR OCCUPANCY.
Installation of suspended scaffold for facade work and/or inspection. Amend #4, added outrigger details
Installation of suspended scaffold for facade work and/or inspection. Amend #4, added outrigger details
Installation of suspended scaffold for facade work and/or inspection. Amend #4, added outrigger details
PLUMBING FILED IN CONJUNCTION OF 20-STORY NYCHA MULTIPLE DWELLING AS PART OF THE NYCHA PACT RENOVATION: REPLACEMENT OF EXISTING KITCHEN AND BATHROOM FIXTURES ON EXISTING ROUGH IN, NO CHANGE TO USE, EGRESS OR OCCUPANCY.
PLUMBING FILED IN CONJUNCTION OF 20-STORY NYCHA MULTIPLE DWELLING AS PART OF THE NYCHA PACT RENOVATION: REPLACEMENT OF EXISTING KITCHEN AND BATHROOM FIXTURES ON EXISTING ROUGH IN, NO CHANGE TO USE, EGRESS OR OCCUPANCY.
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLANS. SIDEWALK SHED SHALL COMPLY WITH CHAPTER 33 OF THE 2022 NYC BUILDING CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLANS. SIDEWALK SHED SHALL COMPLY WITH CHAPTER 33 OF THE 2022 NYC BUILDING CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLANS. SIDEWALK SHED SHALL COMPLY WITH CHAPTER 33 OF THE 2022 NYC BUILDING CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLANS. SIDEWALK SHED SHALL COMPLY WITH CHAPTER 33 OF THE 2022 NYC BUILDING CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.