12 total
Installation of suspended scaffold for facade inspection/repair.
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
Facade repairs as per plans. No change in use, egress, or occupancy.
Garage repairs as per plans. No change in use, egress, or occupancy.
Shoring of garage as per plans. No change in use, egress, or occupancy.
GENERAL CONSTRUCTION SCOPE ASSOCIATED WITH RENOVATION AND COMBINATION OF UNITS 2HN AND 2JN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
STRUCTURAL FILING AND TEMP BRACING/SHORING FOR THE RENOVATION AND COMBINATION OF UNITS: 2LN, 3LN, 4FN, 5FN, 6LN, 7LN, 6AS, 7AS
GENERAL CONSTRUCTION SCOPE ASSOCIATED WITH INTERIOR RENOVATION AND COMBINATION OF RESIDENTIAL UNITS 7KN AND 7JN PER TPPN 3/97.
PL SCOPE: RENOVATION AND COMBINATION OF UNITS: 2/3L-N, 4/5F-N, 5K/L-N, 6/7L-N, 6/7 A-S, 7A/B-S, 7K/L-S. CAP AND REMOVAL OF RISERS IN 7L-N, 5F-N, 5L-N, 3L-N,7L-S, 6A-S.
INSTALLATION OF SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
AT&T - Relocation of existing telecommunications antennas with replacement of RRH units on roof. Removal, installation, and retrofit of cabinets on existing equipment platform with reinforcement of the existing equipment platform on roof. All work in compliance with TPPN 5/98. No change to occupancy, use, or egress.
INSTALLATION OF SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.