26 total · Page 1 of 2
INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS IN COMPLIANCE WITH CHAPTER 33 OF NYC BC. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION
Plumbing application herewith filed to replace existing plumbing fixtures in the kitchen and bathroom. No change in use, egress or occupancy.
Plumbing for proposed Nail Salon. (4) Pedicure Chairs, (1) Washing machine, (2) Lavatory, (1) Water closet and one electrical hot water heater at Cellar.
Interior renovation of existing commercial space to be a Nail Salon. No change of Egress and C of O.
Installation of pipe scaffold as per plans in compliance with chapter 33 of NYCBC. No change in use, egress or occupancy under this application
APPLICATION IS HEREWITH FILED FOR INTERIOR ALTERATION, HAND-DEMOLITION - REMOVE AND REPLACE ALL INTERIOR FINISHES AND FIXTURES INCLUDING, BUT NOT LIMITED TO THE FOLLOWING: CABINETS, DOORS AND DOOR FRAMES FOR APT 12B. NO CHANGE IN USE, EGRESS OR OCCP.
APPLICATION FILE TO INTERIOR RENOVATION AS MINOR SHEETROCK, FLOOR TILE, CEILING WORK & COSMETIC WORK AT 12th FLOOR APT.# 12M AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
ROOF AND FACADE REPAIRS AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
Installation of suspended scaffold for facade inspection/ Repair.
Installation of temporary material hoist as per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
AT&T - Removal and replacement of antennas with removal and installation of RRH units on roof. Removal, retrofit and installation of cabinets on equipment platform on roof. All work in compliance with TPPN 5/98. No change to occupancy, use, or egress.
INSTALLATION OF GAS RANGE TO CONNECT TO EXISTING APARTMENT GAS SYSTEM
THE SCOPE OF WORK PROPOSED IN THIS ALTERATION APPLICATION IS STRICTLY LIMITED TO WORK AT DEMISING WALL BETWEEN THE TWO DWELLING UNITS, 15A &15G AS SHOWN ON PLANS. THERE IS NO CHANGE IN USE, OCCUPANCY OR MEANS OF EGRESS.
Repair of slab, retaining wall and other miscellaneous structural elements related to the ramp of the parking garage.
SPRINKLER WORK RELATED TO STRUCTURAL REPAIR OF CEILING AT BASEMENT LEVEL PER PLANS FILED.
Proposed storage of max 25PSF on top of heavy duty sidewalk shed in compliance with chapter 33 of NYCBC. No change in use, egress, or occupancy under this application.
STRUCTURAL WORK AS PER PLANS FILED HEREWITH. RELATED FOUNDATION WORK TO BE FILED SEPARATELY. NO CHANGE TO USE EGRESS NOR OCCUPANCY.
ERECT NON-ILLUMINATED ACCESSORY CHANNEL LETTER WALL SIGN ON STOREFRONT, NON-FLASHING, NON-ADVERTISING SIGN, NO CHANGE IN USE, EGRESS, OR OCCUPANCY
PROPOSE PLUMBING WORK INCONJUNCTION WITH ARCH DESIGN AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
PROPOSE INTERIOR RENOVATION AT 1ST FLOOR CAFE. MINOR PARITITONS, MECHANICAL WORK AND FINISH WORK AS PER PLAN. PLUMBING WILL BE FILED SUBSEQUENT AND FENCE WILL BE FILED SEPARTELY UNDER DOBNOW#. NO CHANGE IN USE, EGRESS OR OCCUPANCY.