579 FT WASHINGTON AVENUE— Violations & Issues
Top Violations
Top 311 Complaints
§27-2104(B) HMC POST A PROPER NOTICE REGARDING RENT STABILIZATION LAW, IN A FORM APPROVED BY THE COMMISSIONER, IN A CONSPICUOUS LOCATION WITHIN THE COMMON AREA AT THE BUILDINGS ENTRANCE. FOR MORE INFORMATION ABOUT SIGNAGE REQUIREMENTS, PLEASE VISIT: HTTPS://WWW.NYC.GOV/SITE/HPD/SERVICES-AND-INFORMATION/REQUIRED-SIGNAGE.PAGE
§ 27-2045(B)(1)(B) HMC, § 12-06, § 12-07, § 12-09 RCNY REPAIR, REPLACE OR PROVIDE AN APPROVED AND OPERATIONAL CARBON MONOXIDE DETECTING DEVICE, INSTALLED IN ACCORDANCE WITH APPLICABLE LAW AND RULES MISSING IN THE ENTIRE APARTMENT LOCATED AT APT 7E, 5th STORY, 1st APARTMENT FROM WEST AT NORTH
Apt: 7E
§ 27-2045(B)(1)(A) HMC, § 12-01, § 12-03 RCNY REPAIR, REPLACE OR PROVIDE AN APPROVED AND OPERATIONAL SMOKE DETECTING DEVICE, INSTALLED IN ACCORDANCE WITH DEPARTMENT OF BUILDINGS RULES AND REGULATIONS MISSING IN THE ENTIRE APARTMENT LOCATED AT APT 7E, 5th STORY, 1st APARTMENT FROM WEST AT NORTH
Apt: 7E
§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDANT MATERIAL AT CEILING AT BULKHEAD
§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE SPRING BALANCE AT UPPER WINDOW SASH AT WINDOW TO FIRE ESCAPE IN THE 1st ROOM FROM NORTH AT WEST LOCATED AT APT 7E, 5th STORY, 1st APARTMENT FROM WEST AT NORTH
Apt: 7E
§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILING AT BULKHEAD
HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 7E, 5th STORY, 1st APARTMENT FROM WEST AT NORTH
Apt: 7E
§ 27-2070 ADM CODE PROVIDE AN ADEQUATE SUPPLY OF GAS TO THE FIXTURES AT RANGE IN THE KITCHEN LOCATED AT APT 6C, 3rd STORY, 2nd APARTMENT FROM NORTH AT EAST
Apt: 6C
§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDANT PLASTER AT CEILING AT 1st PUBLIC HALL BULKHEAD FROM EAST AT SOUTH, 5th STORY
§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CELLING AT 1st PUBLIC HALL BULKHEAD FROM EAST AT SOUTH, 5th STORY