563 W 150TH ST— Violations & Issues
Top Violations
Top 311 Complaints
§ 27-2026 ADM CODE REMOVE ALL OBSTRUCTIONS AND REPAIR ALL DEFECTS IN DRAIN AT WASHBASIIN IN THE BATHROOM LOCATED AT APT 3F, 6th STORY, 1st APARTMENT FROM NORTH AT EAST
Apt: 3F
§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE PRIVATE HALLWAY LOCATED AT APT 3F, 6th STORY, 1st APARTMENT FROM NORTH AT EAST
Apt: 3F
§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... APPROX 30 SQ FEET AT CEILING AND ALL WALLS IN THE BATHROOM LOCATED AT APT 5E, 5th STORY, 2nd APARTMENT FROM EAST AT SOUTH
Apt: 5E
§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDANT MATERIAL AT WEST WALL INTERMEDIATE LANDING BETWEEN 4TH AND 5TH STORY AT PUBLIC HALL, 5th STORY
§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC TILES FLOOR AT PUBLIC HALL, 6th STORY
§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDANT MATERIAL AT WEST AND NORTH WALL AT BULKHEAD AT PUBLIC HALL, 6th STORY
§ 27-2026 ADM CODE REPAIR THE LEAKY AND/OR DEFECTIVE FAUCETS AT SINK IN THE KITCHEN LOCATED AT APT 5E, 5th STORY, 2nd APARTMENT FROM EAST AT SOUTH
Apt: 5E
§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT EAST AND WEST WALL IN THE BATHROOM LOCATED AT APT 2C, 3rd STORY, 2nd APARTMENT FROM WEST AT NORTH
Apt: 2C
§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE BATHROOM LOCATED AT APT 2C, 3rd STORY, 2nd APARTMENT FROM WEST AT NORTH
Apt: 2C
§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDANT MATERIAL AT CEILING AT PUBLIC HALL, 502nd STORY