5 total
INSTALLATION OF HEAVY DUTY SIDEWALK SHED DURING BUILDING ALTERATION, FILED SEPARATELY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
INSTALLATION OF TEMPORARY SCAFFOLD AS PER DRAWINGS. SCAFFOLD SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
REPLACE PLUMBING FIXTURES & REPLACE ELECTRICA STOVE FOR APT#4F ON THE 4TH FLOOR;REPLACE ELECTRICA STOVE FOR APT#3F ON THE 3RD FLOOR.INTERIOR RENOVATION WORK FILED UNDER SEPARATE FILING IN DOB NOW#M00504795.NO CHANGE IN USE,EGRESS AND OCCUPANCY.
INSTALL & REMOVE NON-LOAD BEARING INTERIOR PARTITIONS FOR APT#3F & 4F ON THE 3RD & 4TH FLOOR.PLUMBING WORK FILED UNDER SEPARATE FILING IN DOB NOW#M00510343. NO CHANGE IN USE,EGRESS AND OCCUPANCY.
FACADE REPAIR WHICH INCLUDES BRICK POINTING AND REPAIR STUCCO AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION. SIDEWALK SHED FILED UNDER SEPARATE APPLICATION.