4 total
Retrofit/replacement of (5) (E) air handler chilled water coils w/ (N) field fabricated DX coil & VRF/DX condensers w/ supplemental VRF fan coils at 1st Fl.. (E) chiller, cooling tower, CW & CHW pumps to be removed. (E) heating coils & HW pumps to remain.
INSTALLATION OF SIDEWALK SHED AS INDICATED ON THE ATTACHED DRAWINGS. THERE ARE NO CHNAGES IN USE, EGRESS OR OCCUPANCY
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. LIVE LOAD 300 PSF
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. LIVE LOAD 300PSF.