532 W 143RD ST— Violations & Issues
Top Violations
§ 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PRESUMED LEAD PAINT THAT IS PEELING OR ON A DETERIORATED SUBSURFACE USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) CEILING, 1st DOOR FRAME FROM NORTH AT EAST WALL IN THE BATHROOM LOCATED AT APT 23, 2nd STORY, 2nd APARTMENT FROM EAST AT SOUTH
Apt: 23
§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE WAINSCOTTING AT EAST WALL, WAINSCOTTING AT WEST WALL IN THE PRIVATE HALLWAY LOCATED AT APT 23, 2nd STORY, 2nd APARTMENT FROM EAST AT SOUTH
Apt: 23
§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... GREATER THAN 10 SQUARE FEET AT CEILING CEILING IN THE BATHROOM LOCATED AT APT 23, 2nd STORY, 2nd APARTMENT FROM EAST AT SOUTH
Apt: 23
§ 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 62, 6th STORY, 1st APARTMENT FROM WEST AT NORTH
Apt: 62
§ 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT BSMT-APT 1, 2nd BSMT-APT FROM EAST AT SOUTH
Apt: 1
§ 27-2033 ADM CODE PROVIDE READY ACCESS TO BUILDINGS HEATING SYSTEM DOOR LOCKED AT BASEMENT AT BOILER ROOM
§ 27-2033 ADM CODE PROVIDE READY ACCESS TO BUILDINGS HEATING SYSTEM LOCKED DOOR AT BOILER ROOM
§ 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 53, 5th STORY, 2nd APARTMENT FROM EAST AT SOUTH
Apt: 53
§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING IN THE KITCHEN LOCATED AT APT 23, 2nd STORY, 2nd APARTMENT FROM EAST AT SOUTH
Apt: 23
§ 27-2046.1 HMC: REPAIR OR REPLACE THE CARBON MONOXIDE DETECTING DEVICE(S). MISSING IN THE ENTIRE APARTMENT LOCATED AT APT 23, 2nd STORY, 2nd APARTMENT FROM EAST AT SOUTH
Apt: 23