9 total
AT&T - Installation and removal of cabinets on existing equipment platform on roof. All work in compliance with TPPN 5/98. No change to occupancy, use, or egress.
Installation of non-emergency gas fired generator with related gas booster pump on existing equipment platform on roof. No change to occupancy, use, or egress.
Installation of gas meter and gas piping as per plans. No change to occupancy, use, or egress.
VERIZON Modification - Replacement of existing non-emergency gas generator on the roof. Related plumbing filed under DOB # M00779001. No change is use, egress or occupancy.
AT&T - Replacement/removal of antennas & RRH units & installation of antenna kickbacks on the roof. Retrofit of cabinets on the existing equipment platform on the roof. All work is in compliance with TPPN 5/98. No change to occupancy, use or egress.
AT&T - Replacement of existing RRH units on the roof. Replacement & retrofit of existing cabinets on the existing equipment platform on the roof. All work in compliance with TPPN 5/98. No change in occupancy, use or egress.
REPLACE PLUMBING FIXTURES AT APT 31/32 (3RD FL) AND 44/45 (4TH FL).
INSTALLATION OF HEAVY DUTY SIDEWALK SHED DURING BUILDING ALTERATION, FILED SEPARATELY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
AT&T - Replacement of existing telecommunications antennas with installation/replacement of RRH units on roof. All work in compliance with TPPN 5/98. No change to occupancy, use, or egress.