18 total
INSTALLATION OF 300PSF SIDEWALK SHED AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CH #33 OF THE NYC CODE 2022. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
Cap & Remove Gas Stove in Apts. 4A and 5A. Install new Electric Stove in Apt 4A. Relocate Sink & Dishwasher in Apt 4A.
Garage repair as per plans. No change in use, egress or occupancy.
Filed to Combine Apartments 4A & 5A. Install new interior stair from 4th flr to 5th flr. Cap & Remove gas stove in Apt 5A. Renovate Kitchen in Apt 4A. No change in use, egress, or occupancy.
plumbing work in apt 1D
interior renovation on apt 1D
plumbing work in apt 4B
interior renovation in apt 4B
plumbing work in apt 4E
plumbing work in apt 1c
interior renovation of apt 1C
interior renovation of apt 4E
PLUMBING WORK IN APT 3M
interior renovation of apt 3M.
INSTALLATION OF PIPE SCAFFOLD AS SHOWN ON PLANS. NO CHANGES TO USES, EGRESS OR OCCUPANCY.
REPLACING EXISTING PLUMBING FIXTURES IN APT 1M.
REPLACE 3 WATER FIXTURES AT SAME LOCATION ON NEW ROUGHING, REPLACE 1 GAS FIXTURE AT SAME LOCATION ON EXSITING ROUGHING, RELOCATE 1 WATER FIXTURE, 1 NEW WATER FIXTURE
interior renovation of apt 1m.