8 total
REPLACE BOILER AND GAS BURNER WITH GAS-FIRED BOILER AS PER PLANS. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
INSTALL NEW HOT WATER BOILER AS PER PLANS. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
CONNECT REPLACEMENT GAS-FIRED BOILER TO EXISTING GAS PIPING AS PER PLANS. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
INSTALLATION OF 300PSF SIDEWALK SHED AS PER PLANS. SIDEWALK SHED SHALL COMPLY WITH CHAPTER # 33 OF THE NYC CODE 2022, NO CHANGES IN USE EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
PROPOSED STRUCTURAL REPAIRS TO AN EXIST. STORE AND CELLAR DUE TO FIRE-DAMAGE.
FILED PLUMBING WORK FOR 1ST FLOOR COMMERCIAL STORE (PREVIOUS E-BIKE), AND UNIT 4,5&11(2ND &3RD FLOOR). NO CHANGE TO EXIST. USE, EGRESS OR OCCUPANCY.
INTERIOR RENOVATION FOR A FIRE-DAMAGED MIXED-USE BUILDING. NO CHANGE TO EXISTING USE, EGRESS OR OCCUPANCY
Installation of new Dish site including the installation of 3 new sectors with 6 RRH units, 1 new GPS unit on roof. Install 1 cabinets on steel platform on roof. Related conduit run from cellar to OSP to roof. All in conformance with TPPN 5/98.