32 total · Page 1 of 2
East Midtown Plaza Bldg F, exterior FISP Cycle 9 related facade repairs as per the plans filed including: Concrete spall and wall air conditioner sleeves repairs. Sheet metal replacement at sills. Localized brick replacement & mortar joint replacement.
Installation and use of suspended scaffold.
Renewal of 400 2nd Ave. - SR 23/0729 (APPROVED)
REPLACE EXISTING 20 HP HIGH PRESSURE GAS BOILER (NYC BOILER #: 170707-01) W/ NEW 20 HP HIGH PRESSURE GAS BOILER AT EXISTING BOILER ROOM AT FIRST FLOOR. NO GAS TEST IS REQUIRED - DISCONNECT BY THE APPLIANCE SHUTOFF VALVE BY THE EXISTING GAS BOILER.
INSTALLATION OF 300psf SIDEWALK SHED AS PER PLANS ,SIDEWALK SHED SHALL COMPLY WITH CHAPTER # 33 OF THE CODE 2014, NO CHANGES IN USE, EGRESS AND OCCUPANCY UNDER THIS APPLICATION.
East Midtown Plaza Bldg A, exterior FISP Cycle 9 related facade repairs as per the plans filed including: Concrete spall and wall air conditioner sleeves repairs. Sheet metal replacement at sills. Localized brick replacement & mortar joint replacement.
New ramp and raised slab for Chase Bank.
Suspended Scaffold installation as per plans filed herewith in conjunction with CD5 SR23-723 under M00965605-I1 filing.
Interior renovation for Chase Bank. No change to use, egress or occupancy.
Modifying the plumbing components for Chase bank.
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
modifying the mechanical system for Chase Bank.
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
INTERIOR RENOVATION OF APT. #9H. NO CHANGE OF USE, EGRESS OR OCCUPANCY.
East Midtown Plaza Bldg D & E, exterior FISP Cycle 9 related facade repairs as per the plans filed including: Concrete spall and wall air conditioner sleeves repairs. Sheet metal replacement at sills. Localized brick replacement & mortar joint replacement
NEW PLUMBING WORK APT #9H. IN CONJUNCTION WITH JOB # M01232170
East Midtown Plaza Bldg B & C, exterior FISP Cycle 9 related facade repairs as per the plans filed including: Concrete spall and wall air conditioner sleeves repairs. Sheet metal replacement at sills. Localized brick replacement & mortar joint replacement
FILE PLUMBING WORK FOR NINTH FLOOR APT. 9B. NO CHANGE OF USE, EGRESS OR OCCUPANCY.
INTERIOR RENOVATION TO RE-TILE BATHROOM AND KITCHEN WALLS AND FLOOR, REPLACE KITCHEN CABINETS AND DRAWERS FOR 9TH FLOOR APT. 9B. NO CHANGE OF USE, EGRESS OR OCCUPANCY.