7 total
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
Installation of new DISH telecom site on roof. Install (3) antenna sectors, (6) RRH units, (1) GPS unit, (1) cabinet on platform. No change to use, egress, or occupancy. All in compliance with TPPN 5/98.
Waterproofing on 2nd floor driveway. No change to use, egress or occupancy.
REPLACE EXISTING COOLING TOWER SYSTEM WITH A NEW AIR COOLED CHILLER PLANT
INSTALLATION OF TEMPORARY 72' HIGH PIPE SCAFFOLD AT VARIOUS LEVELS FOR FACADE REPAIR WORK AS PER PLAN. NO CHANGE IN USE EGRESS OR OCCUPANCY,PIPE SCAFFOLD SHALL COMPLY WITH CHAPTER#33 OF 2014 THE NY BUILDING CODE.
INSTALLATION OF TEMPORARY 26' HIGH PIPE SCAFFOLD ORIGINATING (OFF GRADE) FOR FACADE REPAIR WORK AS PER PLAN. NO CHANGE IN USE EGRESS OR OCCUPANCY,PIPE SCAFFOLD SHALL COMPLY WITH CHAPTER#33 OF 2014 THE NY BUILDING CODE.
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE.LIVE LOAD 300PSF.