4 6 AVENUE— Violations & Issues
Top Violations
§ 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK EXTERIOR SOUTH WALL, AT SOUTH YARD YARD
§ 27-2005 ADMIN. CODE: PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE MASONARY CONCRETE RISER AT 3RD THROUGH 8TH FROM BOTTOM UP, AT BUILDING FRONT AT STOOP
§ 27-2005 ADMIN. CODE: PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE 3RD, 4TH, 5TH, 6TH, 7TH AND 8TH RISERS FROM BOTTOM UP AT BUILDING FRONT STOOP. AT PUBLIC HALL STAIRS
§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE DOOR FRAME IN THE ENTRANCE LOCATED AT APT 2, 1st STORY, 1st APARTMENT FROM NORTH AT EAST
Apt: 2
§ 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK THE CEILING IN THE ENTIRE APARTMENT LOCATED AT APT 2, 1st STORY, 1st APARTMENT FROM NORTH AT EAST
Apt: 2
§ 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR THE CEILING IN THE 1st ROOM FROM NORTH LOCATED AT APT 2, 1st STORY, 1st APARTMENT FROM NORTH AT EAST
Apt: 2
§ 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK FROM EXTERIOR SOUTH WALL, AT SOUTH YARD
§ 27-2005 ADMIN. CODE: PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE MASONARY CONCRETE RISER AT 3RD THROUGH 8TH UP FROM BOTTOM FRONT YARD AT STOOP
§ 27-2005 ADMIN. CODE: PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE 3RD,5TH,6TH. AND 7TH CONCRETE RISER FROM BOTTOM UP AT BUILDING FRONT STOOP
§ 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR THE CEILING IN THE 1st ROOM FROM NORTH AT WEST LOCATED AT APT 1, 1st STORY, 1st APARTMENT FROM NORTH AT EAST
Apt: 1