380 RECTOR PLACE, Manhattan, NY, 10280 · New York City · 25 total events
Apt 20F — Possession
0 infested unit(s) reported
Plaza deck waterproofing as per drawings. No change to use, egress or occupancy.
ENTIRE BUILDING
ENTIRE BUILDING
ENTIRE BUILDING
ENTIRE BUILDING
AT EXISTING SWIMMING POOL PROPOSED PARTIAL DECK WATERPROOFING AND EXPANSION JOINT REPLACEMENT AS PER PLANS FILED HEREWITH. THERE IS NO CHANGE IN USE, EGRESS OR OCCUPANCY.
FILING APPLICATION FOR THE INTERIOR RENOVATION OF APTS. 10F & 10G ON THE 10TH FLOOR AS PER THE PLANS SUBMITTED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
FILING FOR RAILING INSTALLATION ON ROOF LEVEL. NO CHANGE TO EGRESS USE OR OCCUPANCY.
APARTMENT ONLY
FILING APPLICATION FOR THE INTERIOR RENOVATION OF APTS. 10F & 10G ON THE 10TH FLOOR AS PER PLANS SUBMITTED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
FIRE ESCAPE
§ 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE HINGES AT BUILDIING ENTRANCE DOOR, FIRST DOOR FROM SOUTH AT WEST
Installation of suspended scaffold during facade inspection/repair SR23/0045
RESTORATION OF EXISTING RESIDENTIAL BUILDING FACADE REPAIRS INCLUDING MASONRY BRICK REPLACEMENT, MORTAR REPOINTING, BALCONY CURB REPAIR, WINDOW SILL REPAIR.AS INDICATED ON PLANS SUBMITTED HEREWITH. THERE IS NO CHANGE, IN USE, EGRESS OR OCCUPANCY.
INSTALLATION OF TEMPORARY ROOF PROTECTION AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY SHALL COMPLY WITH CHAPTER#33 OF 2014 THE NY BUILDING CODE.
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. LIVE LOAD 300PSF
§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... APPROXIMATELY 2 SQ. FT ON THE FLOOR IN THE FOYER LOCATED AT APT 14B, 14th STORY, 2nd APARTMENT FROM SOUTH AT WEST
MOLD
REPLACEMENT OF 4 TON SPLIT SYSTEM ON FLOOR 001. NO CHANGE TO EGRESS, USE, OR OCCUPANCY,
REPLACE AND RELOCATE PLUMBING FIXTURES AS PER SCHEDULE B AND PLANS FILED HEREWITH. NO CHANGE, ETC.
APPLICATION FILED FOR ADDITIONS/MODIFICATIONS TO MECHANICAL (AC REPLACEMENT) ON THE ROOF. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
Installation of new PTAC units in conjunction with architectural and plumbing work. No change of use, occupancy or egress.
Plumbing work filed in conjunction of an apartment renovation filed under application 123865585. No change of use, occupancy or egress.