56 total · Page 1 of 3
Modifications to existing Sprinkler Systems as per plans filed herewith. No change in use, egress or occupancy.
Modifications to existing Sprinkler System as per plans filed herewith. No change in use, egress or occupancy.
General construction work as shown on plans.
Mechanical work as shown on plans (Prebuild Phase - Floors 5, 6, 9)
Structural drawings submitted herewith for interior renovation of existing cellar and first floor commercial tenant space
SOE WORK FOR ONE (1) NEW ELEVATOR AND TWO (2) PLUMBING PITS.
Modifications to existing Plumbing Fixtures as per plans filed herewith. No change in use, egress or occupancy.
Modifications to existing Mechanical System, including new kitchen hood in Cellar with exhaust fan on 1st Floor Roof, as per plans filed herewith. Fire suppression system filed separately with the FDNY. No change in use, egress or occupancy.
Interior renovation of existing cellar and first floor commercial tenant space. No change in use, egress or occupancy.
Plumbing work in conjunction with alt 1 application # 121206667.
Plumbing work as shown on plans.
Temporary structures for a fashion show. Removed at the end of the programing. No changes to existing structures, use or egress
Plumbing work as shown on plans (Prebuild Phase - Floors 5 & 6).
Structural work as shown on plans
Plumbing work as shown on plans
Modifications to an existing sprinkler system
Mechanical work as shown on plans
General construction work to include interior fitout for private office on 8th floor as shown on plans. Work to include exterior terrace fitout including installation of planters over existing pavers.
Fuel Storage work as shown on plans for reference only. All scope approved/permitted under initial filing M00593264-I1 - subdoc filed to show day tank only, due to DOB Now system limitations.
Installation of generator and fuel tank as shown on plans submitted herewith.