295 PARK AVENUE SOUTH, Manhattan, NY, 10010 · New York City · 32 total events
Self Service
0 infested unit(s) reported
PROPOSED INSTALLATION OF 2 ILLUMINATED, NON FLASHING, ACCESSORY BUSINESS SIGNS. ONE FACING PARK AVENUE SOUTH, AND ONE FACING E 23 ST. WORDING Somedays
HEREBY FILING FOR RENOVATION TO EXISTING COMMERCIAL SPACE (INSTALLATION OF PLUMBING FIXTURES). NO CHANGE IN USE, EGRESS OR OCCUPANCY.
HEREBY FILING FOR RENOVATION TO EXISTING COMMERCIAL SPACE. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
INSTALLATION OF PIPE SCAFFOLDING. NO CHANGE IN USE, OCCUPANCY OR EGRESS. WORK SHALL COMPLY WITH CHAPTER 33 OF NYCC.
installation of heavy duty sidewalk shed. no change in use, occupancy or egress. work shall comply with chapter 33 of nycc.
Repair/replace facade as necessary to include masonry, pointing, lintels, shelf angles, sills, limestone and concrete patching and caulking.
PROPOSAL TO INSTALL ILLUMINATED, NON-FLASHING, ACCESSORY BUSINESS SIGN FOR COMMERCIAL TENANT KOREAN ONGI GRILL. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. Wording- 295 KOREAN ONGI GRILL *Korean character* 71
INTERIOR TENANT FIT-OUT OF EXISTING DRINKING & EATING ESTABLISHMENT ON FIRST FLOOR, INCLUDING GENERAL CONATRUCTION & SPRINKLER. NO CHANGE IN USE, OCCUPANCY, OR EGRESS. NO STOREFRONT WORK INCLUDED UNDER THIS APPPLICATION.
STORAGE ON SIDEWALK SHED. NO CHANGE IN USE, OCCUPANCY OR EGRESS. WORK SHALL COMPLY WITH CHAPTER 33 OF NYCC..
INSTALLATION OF 600# TO 1000# CAPACITY MATERIAL ONLY HOISTS AS PER DRAWINGS. HOISTS SHALL COMPLY WITH CH #33 OF THE NYC BLDG CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
INSTALLATION OF PIPE SCAFFOLDING. NO CHANGE IN USE, OCCUPANCY OR EGRESS. WORK SHALL COMPLY WITH CHAPTER 33 OF NYCC.
(A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS.
INSTALLATION OF OUTRIGGER BEAM TO PERFORM FACADE REPAIRS AND BUILDINGFACADE INSPECTION
VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL LOW PRESSURE INSPECTION
VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL LOW PRESSURE INSPECTION
VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL LOW PRESSURE INSPECTION
FAILED TO FILE FISP CYCLE 9B TECHNICAL REPORT BY 2/21/2023
Application filed for General Construction including interior renovation & partitions.
Application filed herewith for Plumbing system.
Application filed herewith for Mechanical system and relocating existing unit.
CYCLE 8B NO REPORT FILED
Carrier: T-Mobile. Relocate (3) existing sectors to a new antenna frame on the upper rooftop. Related cabling routed to the upper roof, connections on ground floor unchanged. All work in conformance with TPPN #5/98. No change in use, egress,
INSTALL ILLUMINATED WALL SIGN (SUMMER NAIL STUDIO)
FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
PROVIDE APPROXIMATELY 50 LINEAR FEET OF SIDEWALK SHED ON EXPOSURE 1 AND APPROXIMATELY 20 LINEAR FEET OF SIDEWALK SHED ALONG EXPOSURE 2 TO SAFEGUARD PUBLIC AND PROPERTY
INSTALL PLUMBING FIXTURES FOR 1ST FLOOR EXISTING STORE. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
EXHAUST FAN SYSTEM FOR EXISTING STORE. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2017 INSPECTION REPORT
FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4