8 total
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE.
INSTALLATION OF HEAVY DUTY SIDEWALK SHED. NO CHANGE IN USE, OCCUPANCY OR EGRESS. WORK SHALL COMPLY WITH CHAPTER 33 OF NYCC.
LOCALIZED MASONRY REPLACEMENT, AND STONE LINTEL REPLACEMENT AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
INSTALLATION OF NEW SIDEWALK SHED AT 301 WEST 150TH STREET, MANHATTAN AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
PARAPET WALL BRICK MASONRY,WINDOW HEADER LIMESTONE,WINDOW SILL LIMESTONE,BRICK CRACK REPAIR,MORTAR JOINT REPAIR,DECORATIVE WINDOW HEADER JOINTS REPAIR, VERTICAL PARAPET WALL CRACK REPAIR AND TERRA COTTA WORK. NO CHANGE IN USE EGRESS OR OCCUPANCY. NO CHANG
INSTALLATION OF HEAYDUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION. SIDEWALK SHED SHALL COMPLY WITH CHAPTER 33 OF THE 2014 NYC BUILDING CODE.
Modification to an existing Verizon telecommunications site. Install 2 new antennas, replace 6 existing antennas, replace 3 existing RRH units, and install 9 new RRH units on the roof. All work is in conformance with TPPN #5/98. There is no change in use, egress, or occupancy.
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED FOR REMEDIAL REPAIRS AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION. LIVE LOAD 300 PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER # 33 OF THE 2014 CODE