26 EAST 60 STREET is a prewar 1910 building, 5 floors, 8 units in Midtown East, NYC. Owned by FORTUSA REALTY CORP. Public records show 271 open violations, 14 active litigation matters on file. Risk signals: 1 bedbug report. Rent stabilization on file covers 7 units (registered 2024).
Manhattan · March 2026
Best & worst months to sign a lease
Potential savings: ~12% by timing your move to December.
Asking rent per bedroom type — switch tabs to see each with effective (concession-net) rent.
Monthly counts over the last 7 years · all data sources
§ 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT RECESS AREA AT SOUTH WINDOW IN THE 3rd ROOM FROM EAST LOCATED AT APT 3C, 3rd STORY, 2nd APARTMENT FROM NORTH AT EAST
§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT SOUTH AND EAST WALL AT PUBLIC HALL, 4th STORY
§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDANT MATERIAL AT SOUTH WALL AT PUBLIC HALL, 2nd STORY
§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDANT MATERIAL AT SOUTH AND EAST WALL AT PUBLIC HALL, 4th STORY
§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT SOUTH WALL AT PUBLIC HALL, 2nd STORY
Portfolio-level grade reflects the landlord's buildings across NYC, weighted by unit count. Individual building grades may differ.
View full landlord profileTop 2 by score · of 3 total
ACRIS deeds and regulatory filings
HPD Class B Violation — § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDANT MATERIAL AT SOUTH WALL A
HPD Class A Violation — § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT SOUTH WALL AT PUBLIC HALL, 2
HPD Class B Violation — § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT RECESS AREA AT SOUTH WINDOW IN
HPD Class B Violation — § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDANT MATERIAL AT SOUTH AND EA
HPD Class B Violation — § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT RECESS AREA AT SOUT
HPD Class A Violation — § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT SOUTH AND EAST WALL AT PUBLI
HPD Class C Violation — § 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF SCALDING HOT WATER ABOVE 130 DEGREES IN THE ENTIRE APA
HPD Class B Violation — § 27-2045(B)(1)(A) HMC, § 12-01, § 12-03 RCNY REPAIR, REPLACE OR PROVIDE AN APPROVED AND OPERATIONAL SMOKE DETECTING DEV
HPD Class B Violation — § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CAULKING AROUND BATHTUB IN THE BATHROOM
HPD Class B Violation — § 27-2045(B)(1)(B) HMC, § 12-06, § 12-07, § 12-09 RCNY REPAIR, REPLACE OR PROVIDE AN APPROVED AND OPERATIONAL CARBON MON