14 total
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLAN. NO CHANGE IN USE,EGRESS OR OCCUPANCYTHE SIDEWALK SHED IS AT WEST 143RD STREET AND ADAMA CLAYTON POWELL BLVD ELEVATIONS.
BETA-MAX HOIST INSTALLED IN ORDER TO LIFT THE COPING STONES. SIDEWALK SHED FILED UNDER SEPARATE APPLICATION.
MECHANICAL WORK IN CONJUNCTION WITH RENOVATION OF 6-STORY NYCHA MULTIPLE DWELLING THROUGHOUT:INSTALLATION OF NEW AIR-CONDITIONING SYSTEMS, VENTILATION SYSTEMS AND MISCELLANCEOUS HVAC WORK; NO CHANGES TO USE, EGRESS, OR OCCUPANCY.
INTERIOR RENOVATION OF 6-STORY NYCHA MULTIPLE DWELLING AS PART OF THE NYCHA PACT RENOVATION: REPLACEMENT OF EXISTING KITCHEN AND BATHROOM FXITURES ON EXISTING ROUGH-IN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
PLUMBING WORK FILED IN CONJUNCTION WITH RENOVATION OF 6-STORY NYCHA MULTIPLE DWELLING AS PART OF THE NYCHA PACT RENOVATION: INSTALLATION OF NEW SANITARY, STORM, DOMESTIC WATER, SANITARY VENT AND GAS PIPING. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
INTERIOR RENOVATION OF 6-STORY NYCHA MULTIPLE DWELLING AS PART OF THE NYCHA PACT RENOVATION: INTERIOR RENOVATION OF KITCHEN AND BATHROOM THROUGHOUT, REPLACE OF CASEWORK, COUNTERS AND CABINETS; NO CHANGES TO USE, EGRESS, OR OCCUPANCY.
LIMITED TO REPAIR OF EXISTING EXTERIOR FACADE ELEMENTS OF 6-STORY NYCHA MULTIPLE DWELLING AS PART OF THE NYCHA PACT RENOVATION IN CONJUNCTION WITH REQUIRED LOCAL LAW INSPECTION (FISP). NO CHANGES TO USE, EGRESS, OR OCCUPANCY.
BOILER REPLACEMENT FILED IN CONJUNCTION WITH RENOVATION OF 6-STORY NYCHA MULTIPLE DWELLING THROUGHOUT. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
INSTALLATION OF NEW BOILER FILED IN CONJUNCTION WITH RENOVATION OF 6-STORY NYCHA MULTIPLE DWELLING THROUGHOUT. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
SPRINKLER WORK IN CONJUNCTION WITH RENOVATION OF 6-STORY NYCHA MULTIPLE DWELLING THROUGHOUT. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
INSTALLATION OF NEW SIDEWALK SHED AT 2453 AC POWELL BOULEVARD, MANHATTAN, NY 10030 AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
INSTALLATION OF NEW SIDEWALK SHED AT 2453 AC POWELL BOULEVARD, MANHATTAN AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
INSTALLATION OF TEMPORARY CONSTRUCTION FENCE AT 2453 AC POWELL BOULEVARD, MANHATTAN AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
INSTALLATION OF NEW SIDEWALK SHED AT 2453 AC POWELL BOULEVARD,MANHATTAN AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.