INTERIOR RENOVATION OF APT. 28E WITH MINOR DEMOLITION. REMOVE & RELOCATE NON LOAD BEARING PARTITIONS PER PLANS. NO CHANGE IN EGRESS, OCCUPANCY OR USE IS INVOLVED UNDER THIS APPLICATION.
Proposed kitchen and bathroom renovations.
Interior alterations (non-load bearing partitions walls) to apt 8H
0 infested unit(s) reported
Legalization of two existing apartment units. Combining units 5D & 5E, per TPPN #3/1997. No change in use, egress or occupancy.
General Construction work as per plans filed herewith.
Proposed plumbing work at apt 9
Interior alterations to apt 9H
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. LIVE LOAD 300 PSF
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
Inspection, Additional Drop Locations
CD5 renewal for facade work (first CD5 renewal transitioning from hardcopy/paper method to newly-imposed NYC DOB NOW process) SR 21/0323
INSTALLATION OF TEMPORARY SCAFFOLD AS PER DRAWINGS. SCAFFOLD SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
Interior finish upgrades of aprtment unit 23D ; removal of (1) powder room; enlargement of the main bathroom as shown on plans. No change to use, egress or occupancy.
Inspection, Additional Drop Locations
Masonry Facade repair work as per drawings. No change to use, egress or occupancy.
Masonry Facade repair work as per drawings. No change to use, egress or occupancy.
Masonry Facade & Greenhouse repair work as per drawings. No change to use, egress or occupancy.
Masonry Facade work. Greenhouse repair work as per drawings. No change to use, egress or occupancy.
Masonry Facade & Greenhouse repair work as per drawings. No change to use, egress or occupancy.
Masonry Facade repair work as per drawings. No change to use, egress or occupancy.
Masonry Facade repair work as per drawings. No change to use, egress or occupancy.
Masonry Facade & Greenhouse repair work as per drawings. No change to use, egress or occupancy.
Masonry Facade work as per drawings. No change to use, egress or occupancy.
Masonry Facade & Greenhouse repair work as per drawings. No change to use, egress or occupancy.
Masonry Facade repair work as per drawings. No change to use, egress or occupancy.
Masonry Facade work. Greenhouse repair work as per drawings. No change to use, egress or occupancy.
(A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS.
RENOVATION OF AN EXISTING APARTMENT, APT 28E ON THE 28TH FLOOR. THERE IS NO CHANGE IN OCCUPANCY, USE, OR EGRESS
PROPOSED INSTALLATION OF TEMPORARY LIGHT DUTY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
INSTALL ADDITIONAL SPRINKLER HEADS IN STORE 9 AS PER PLANS.
Interior renovation of existing class A apartment. No change of use, egress or occupancy under this application.
STORE 9 INSTALL HVAC UNIT AND RELATED DUCTS AS PER PLANS.
Renovation to kitchen and bathrooms in apt 16HJ
PLUMBING MODIFICATION TO STORE 9 AS PER PLANS.
REPLACEMENT (2) NEW LOW PRESSURE (4 PASS) BOILERS WITH (2) NEW COMBINATION GAS/OIL BURNERS. NO CHANGE IN MEANS OF EGRESS USE GROUP OR OCCUPANCY.
INTERIOR RENOVATION TO STORE 9 AS PER PLANS. NO CHANGE IN USE EGRESS OR OCCUPANCY.
INTERIOR ALTERATION TO RENOVATE THREE BATHROOMS AND UPDATE FINISHES AND LIGHTING. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
Modifications to partitions in apartment 9G
install new PTAC air-conditioning system
renovations to apartment 16HJ, interior partitions and ceilings no change to use egress or occupancy
RECONNECT EXISTING LOW PRESSURE GAS LINE, REPLACEMENT (2) NEW GAS FIRED HOT WATER HEATERS ON THE ROOF. NO CHANGE IN MEANS OF EGRESS USE GROUP OR OCCUPANCY.
INTERIOR ALTERATIONS OF EXISTING GROUND FLOOR COMMERCIAL SPACE TO INCLUDE MINOR DEMOLITION, PARTITION AND CARPENTRY WORK AS PER PLANS SUBMITTED HEREWITH. NO CHANGE TO USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION
NEW FLUES FOR HOT WATER HEATER, NEW CONCRETE DIKE FOR OIL TANK. NEW 7/10 GAGE STAINLESS STEEL LINER IN EXISTING VAN PACKER CONCRETE FLUE. NO CHANGE IN MEANS OF EGRESS USE GROUP OR OCCUPANCY.
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Minor plumbing work including replacement of fixtures as per plans filed herewith. No change to use, egress or occupancy.
Interior renovation of apartment 9C including removal and installation of noon bearing partitions and related finishes as per plans filed herewith. No change to use, egress or occupancy.
Remove and replace existing storefront of Starbucks with new in modified window. for pickup.
Proposing construction fence for Starbuck storefront work.