220 W 122ND ST
Similar buildings nearby.
Embed this building’s record
Drop this scorecard into a tenant guide, blog post, or wiki. It updates itself as new violations are filed.
Drop this scorecard into a tenant guide, blog post, or wiki. It updates itself as new violations are filed.
Asking rent per bedroom type — switch tabs to see each with effective (concession-net) rent.
Portfolio-level grade reflects the landlord's buildings across NYC, weighted by unit count. Individual building grades may differ.
View full landlord profileTop 1 by score · of 3 total
ACRIS deeds and regulatory filings
Manhattan · March 2026
Best & worst months to sign a lease
Potential savings: ~8% by timing your move to November.
HPD Class A Violation — § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... APPROXIMATELY 3 SQ.FT AT CEILING IN
HPD Class B Violation — § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING AND EAST WA
HPD Class C Violation — § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSI
HPD Class C Violation — § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING IN THE 1st ROO
HPD Class B Violation — § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... 12 (SQ FT) AT CEILING, 5 (SQ FT) AT
HPD Class B Violation — § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK OVER THE CEILING IN THE 1st ROOM FROM NORTH LOCATED AT APT 4
HPD Class A Violation — (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR
HPD Class I Violation — §27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27-20
Monthly counts over the last 7 years · all data sources
§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... APPROXIMATELY 3 SQ.FT AT CEILING IN THE 2nd ROOM FROM NORTH LOCATED AT APT 3R, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH
§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING AND EAST WALL IN THE 2nd ROOM FROM NORTH LOCATED AT APT 3R, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH
§ 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE HINGES IN THE ENTRANCE LOCATED AT APT 3R, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH
§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING IN THE 1st ROOM FROM NORTH LOCATED AT APT 4F, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH
§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... 12 (SQ FT) AT CEILING, 5 (SQ FT) AT WEST WALL IN THE 1st ROOM FROM NORTH LOCATED AT APT 4F, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH
West Harlem around 125th Street is the neighborhood's commercial and cultural spine — the Apollo Theater, Studio Museum, and a corridor of new development coexist with decades-old barbershops and West African restaurants. Columbia's Manhattanville campus expansion is reshaping the western edge.