2185 ADAM C POWELL JR BOULEVARD
Embed this building’s record
Drop this scorecard into a tenant guide, blog post, or wiki. It updates itself as new violations are filed.
Drop this scorecard into a tenant guide, blog post, or wiki. It updates itself as new violations are filed.
Manhattan
Best & worst months to sign a lease
Monthly counts over the last 7 years · all data sources
§ 27-2033 ADM CODE PROVIDE READY ACCESS TO BUILDINGS HEATING SYSTEM DOOR LOCKED AT BASEMENT AT BOILER ROOM
§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT HALLWAY CLOSET IN THE PRIVATE HALLWAY LOCATED AT APT 5A, 5th STORY, 2nd APARTMENT FROM NORTH AT EAST
§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... AT CEILING IN HALLWAY CLOSET IN THE PRIVATE HALLWAY LOCATED AT APT 5A, 5th STORY, 2nd APARTMENT FROM NORTH AT EAST
§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDANT MATERIAL AT CEILING, BULKHEAD, ROOF.
§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT CEILING AT BULKHEAD, ROOF.
Learn more about Manhattan in NYC — buildings tracked, typical rents, and resident sentiment.
Explore ManhattanUNSANITARY CONDITION — GARBAGE/RECYCLING STORAGE
DOOR/WINDOW — WINDOW FRAME
UNSANITARY CONDITION — GARBAGE/RECYCLING STORAGE
PLUMBING — WATER SUPPLY
GENERAL — COOKING GAS
HEAT/HOT WATER — ENTIRE BUILDING
GENERAL — BELL/BUZZER/INTERCOM
GENERAL — VENTILATION SYSTEM
PAINT/PLASTER — CEILING
WATER LEAK — SLOW LEAK