211 NORTH END AVENUE, Manhattan, NY, 10282 · New York City · 8 total events
Replacing existing two gas fired absorption chillers on the roof, temporary installation of chiller, new heat exchanger and removal of microturbine with related piping as per plans filed herewith.
Filing in conjunction with replacement chillers for the installation of new gas piping and partial removal of gas piping as per plans filed herewith.
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 LBS PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
IRA to assist with Condition Assessment.
§ 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE ELECTRIC LIGHT FIXTURE AT CEILING IN THE 1st ROOM FROM EAST LOCATED AT APT 6E, 6th STORY, 4th APARTMENT FROM SOUTH AT WEST
Judgment: NO
§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CAULKING, ALL WALLS AT BATHTUB PERIMETER IN THE BATHROOM LOCATED AT APT 6E, 6th STORY, 6th APARTMENT FROM SOUTH AT WEST