201 EAST 86 STREET, Manhattan, NY, 10028 · New York City · 31 total events
SPRINKLER MIODIFICATION AT SUB-CELLAR#2 AND SUB-CELLAR#1. NO CHANGE TO USE OCCUPANCY OR EGRESS.
1 infested unit(s) reported
Propose to perform interior renovations to remove partitions, remove convenience stair from 1st to 2nd floor, create opening for future stair and erect demising walls. No change to use, egress or occupancy.
NEW STEEL FRAMING ELEMENTS REQUIRED TO INFILL EXISTING CELLAR AND SUB-CELLAR STAIR OPENINGS
INSTALLATION OF 8' HIGH CONSTRUCTION FENCE AS PER DESIGN DRAWINGS
ERECT NON-ILLUMINATED ACCESSORY WALL SIGN-D WITH BACK PANEL @E 86 STREET ELEVATION NON-FLASHING, NON-ADVERTISING SIGN, NO CHANGE IN USE, EGRESS, OR OCCUPANCY
ERECT ILLUMINATED ACCESSORY BUSINESS CHANNEL LETTER CANOPY SIGN-B WITH RACEWAY ON THE EXISTING CANOPY STRUCTURE JOB #M00639343, NO CHANGE TO USE, EGRESS OR OCCUPATION
ERECT NON-ILLUMINATED ACCESSORY WALL SIGN-C WITH BACK PANEL, NON-FLASHING, NON-ADVERTISING SIGN, NO CHANGE IN USE, EGRESS, OR OCCUPANCY
ERECT ILLUMINATED ACCESSORY BUSINESS CHANELL LETTER WALL SIGN-A, NO CHANGE TO USE, EGRESS OR OCCUPATION
APPLICATION FILED FOR INTERIOR RENOVATION OF NON-LOAD BEARING PARTITIONS, CEILINGS AND FINISHES ON THE 1ST FLOOR RETAIL SPACE (LULULEMON) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY
INSTALLATION OF SHORINGS TO FACILITATE NEW BEAM CONNECTIONS. THIS APPLICATION INVOLVES NO CHANGE IN USE, OCCUPANCY OR EGRESS.
APPLICATION FILED FOR STRUCTURAL MODIFICATIONS/ADDITIONS ON THE 1ST FL FLOOR RETAIL SPACE (LULULEMON) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
APPLICATION FILED FOR MODIFICATIONS/ADDITIONS TO PLUMBING/SPRINKLER ON THE 1ST FLOOR RETAIL SPACE (LULULEMON) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
APPLICATION FILED FOR MODIFICATIONS/ADDITIONS TO PLUMBING/SPRINKLER ON THE 1ST FLOOR RETAIL SPACE (LULULEMON) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
APPLICATION FILED FOR MODIFICATIONS/ADDITIONS TO MECHANICAL ON THE 1ST FLOOR RETAIL SPACE (LULULEMON) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
INSTALLATION OF TEMPORARY (26'-189') HIGH PIPE SCAFFOLD AT VARIOUS LEVELS FOR FACADE REPAIR WORK AS PER PLAN. NO CHANGE IN USE EGRESS OR OCCUPANCY,PIPE SCAFFOLD SHALL COMPLY WITH CHAPTER#33 OF 2014 THE NY BUILDING CODE.
Propose installation of (1) new 20 ton split system AC unit. No change to use, egress or occupancy
Propose to perform structural work related to separating space for two tenants including framing support of stairs, infill of floors and structural work for new elevator. No change in use, egress or occupancy.
ERECT, MAINTAIN & DISMANTLE BETAMAX HOIST AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE.LIVE LOAD 300PSF.
REMOVAL OF INTERIOR PARTITIONS ON LEVELS 001 & 002. NO CHANGE TO USE, EGRESS, FIRE PROTECTION, OR OCCUPANCY.
No description available
No description available
No description available
No description available
INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
No description available
No description available
No description available
No description available
Judgment: NO