200 EAST 84 STREET, Manhattan, NY, 10028 · New York City · 25 total events
MINOR RENOVATION OF APT 11C. NO CHANGE OF USE, EGRESS OR OCCUPANCY
plumbing work type filed in conjunction with interior renovation of apartment 11c. NO CHANGE TO USE, EGRESS OR OCCUPANCY
(A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS.
this subsequent filed for plumbing related work.
alterations and modifications as shown on drawings at apartment 10F
Combination of units 3D and 3E. Remove kitchen and convert to bathroom.
INTERIOR RENOVATION TO EXISTING APARTMENT #16G.REMOVAL AND INSTALLATION OF INTERIOR NON-BEARING PARTITIONS, FIXTURES, AND FINISHES. AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
Combination of units 3D and 3E. Convert one existing kitchen to new bathroom. Modify one existing full bath to half bath.
Interior general construction at cellar level including replacing existing nonload-bearing metal stud & gypsum board partitions with new. No change to use, egress or occupancy.
Mechanical Systems work for relocation and replacement of duct, mechanical piping and select HVAC units in conjunction with general construction at accessory building rooms at cellar No change to use, egress or occupancy.
HVAC upgrade, installation of the air conditioning systems, associated ducts and piping
Gen. Const. work: fit-out of new commercial tenant for Sage & Sound, work to consist interior non-load bearing partitions, replace floor and ceiling finishes with exterior work facade veneer and store front work. No change to use egress or occupancy
Mechanical System work in conjunction with new commercial tenant for Sage and Sound, work to consist of new duct with associated pipe and new HVAC units as shown on plan. No change to use egress or occupancy under this application.
COnstruction fence at the sidewalk to protect the construction area and provide enclosure to the building storefront.
Structural scope in conjunction with new commercial tenant for Sage and Sound, work to consist of New Lintel, Concrete slab and infill work as shown on plan. No change to use egress or occupancy under this application.
INSTALLATION OF SIDEWALK SHED IN ACCORDANCE WITH NYCC 2014 CHAPTER 33 BUILDING CODE. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
Domestic Plumbing work in conjunction with new commercial tenant for Sage and Sound as shown on plans. No change to use egress or occupancy under this application.
PLUMBING WORK FILED IN CONJUNCTION WITH GENERAL WORK TYPE (OT) APPLICATION #140982667. RELOCATION OF (1) SINK-RES AND (1) DISHWASHER. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
INTERIOR RENOVATION OF EXISTING APARTMENT 11F. MINOR PARTITION AND FINISH WORK AS PER DWG. NO CHANGE IN USE, OCCUPANCY OREGRESS.
PLUMBING WORK AS PER PLANS. NO CHANGE OF USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
INTERIOR RENOVATION OF EXISTING APARTMENT 15F. MINOR INTERIOR PARTITION AND FINISH WORK AS PER DWG. NO CHANGE IN USE, OCCUPANCY AND EGRESS.
General construction of apt 4bc to include modification of interior partitions, doors and finishes as shown on drawings. No change to use, egress or occupancy.
install new washer. remove and cap gas stove.
Herewith file plans to renovate Apt. 11GH. Replace plumbing fixtures. No change to use egress or occupancy.
Installation of temporary sidewalk shed per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.