200 EAST 69 STREET, Manhattan, NY, 10021 · New York City · 91 total events
INSTALLATION OF TEMPORARY PIPE SCAFFOLD & NEEDLE BEAM AS PER PLAN. NO CHANGE IN USE,EGRESS OR OCCUPANCY.
INSTALLATION OF TEMPORARY BETA HOIST AS PER PLAN. NO CHANGE IN USE,EGRESS OR OCCUPANCY.
INSTALLATION OF SINGLE 7000 # CAPACITY PERSONNEL/MATERIAL HOIST DURING BLDG ALTERATION, FILED SEP. HOIST SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. ELEVATOR APPLICATION SUBMITTED SEPARATELY
PIPE SCAFFOLD PROPOSED INSTALLATION OF PIPE SCAFFOLD AS PER PLAN. NO CHANGE IN USE,EGRESS OR OCCUPANCY.
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
SIDEWALK SHED PROPOSED INSTALLATION OF SIDEWALK SHED AS PER PLAN. NO CHANGE IN USE,EGRESS OR OCCUPANCY.
IRA to assist with Condition Assessment
Filing herewith structural work on existing roof. No change in use, occupancy or egress.
Filing herewith mechanical work on existing roof. No change in use, occupancy or egress.
FIVE BELOW-- PLUMBING INSTALLATIONS AND MODIFICATIONS FOR RETAIL RENOVATION.
0 infested unit(s) reported
COOKING GAS
COOKING GAS
CEILING
Installation of 2 Electrical Boilers located on the 1st floor Mezzanine for the retail space.
AT 25TH FLOOR APT 25A- INSTALLATION, REPLACEMENT AND RELOCATION OF PLUMBING FIXTURES. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
RENOVATION OF FINISHES IN EXISTING BEDROOM & BATHROOM. NO CHANGES TO USE, OCCUPANCY OR EGRESS
APARTMENT ONLY
ENTIRE BUILDING
Interior renovations to create a Boiler room on the Mezz level for tenant space (Whole Food Market). No change in occupancy, use or egress.
Installation of new Electric Boilers on Mezzanine tenant space (Whole Foods Market). No change in occupancy, use or egress.
Installation of new Floor drain on the Mezzanine tenant space (Whole Food Market) . No change in occupancy, use or egress.
COOKING GAS
§27-2005 (E) HMC: PROVIDE WRITTEN NOTICE TO THE TENANTS AT LEAST TWENTY-FOUR HOURS PRIOR TO ESSENTIAL SERVICE INTERRUPTION BY POSTING A NOTICE IN A PROMINENT PLACE WITHIN THE PUBLIC PART OF THE BUILDING AND ON EACH FLOOR OF SUCH BUILDING, WHERE AN OWNER MUST MAKE A REPAIR THAT MAY RESULT IN AN INTERRUPTION OF ESSENTIAL SERVICES SUCH AS UTILITIES(HEAT, HOT WATER, GAS, ELECTRICITY, OR ELEVATOR) THAT IS EXPECTED TO CONTINUE FOR MORE THAN TWO HOURS. SAMPLE NOTICE AVAILABLE AT WWW.NYC.GOV/HPD OR AS PROVIDED IN THIS NOTICE OF VIOLATION. MISSING NOTICE FOR NO GAS SERVICE
§ 27-2070 ADM CODE PROVIDE AN ADEQUATE SUPPLY OF GAS TO THE FIXTURES AT GAS RANGE IN THE KITCHEN LOCATED AT APT 17C, 17th STORY, 1st APARTMENT FROM EAST AT SOUTH
COOKING GAS
Modification to existing mechanical system to include new fan coil units and related ductwork in apt. 46A/B. No change in use, egress or occupancy.
Interior renovation and combination of existing apartments 46A and 46B. Work to include non-structural demolition, general construction, and finishes. Apartments combined in compliance with TPPN 3/97. No change in use, egress & occupancy.
GAS INFRASTRUCTURE REPLACEMENT IN CELLAR, GROUND FLOOR, SECOND FLOOR, AND THIRD FLOOR, AND INSTALLATION OF APPLICABLE VALVES AT ALL STOVES IN APARTMENTS. NO CHANGE IN EGRESS OR OCCUPANCY. WORK TO COMPLETED IN CONJUNCTION WITH M01101663.
GAS INFRASTRUCTURE REPLACEMENT IN CELLAR, AND INSTALLATION OF APPLICABLE VALVES AT ALL STOVES IN APARTMENTS. NO CHANGE IN EGRESS OR OCCUPANCY. WORK TO COMPLETED IN CONJUNCTION WITH M01087573.
FIVE BELOW-- GENERAL CONSTRUCTION INCLUSIVE OF INTERIOR PARTITIONS MODIFICATIONS FOR RETAIL RENOVATION. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
FIVE BELOW-- MECHANICAL MODIFICATIONS AND INSTALLATIONS IN CONJUNCTION WITH RETAIL RENOVATION.
Installation of suspended scaffold for facade work or inspection.
GARBAGE/RECYCLING STORAGE
GARBAGE/RECYCLING STORAGE
SLOW LEAK
Plumbing work in conjunction with interior renovation to include partitions, ceiling, doors, and finishes as shown on drawings filed herewith. No change to occupancy, use, or egress.
Interior renovation to include partitions, ceiling, doors, and finishes as shown on drawings filed herewith. No change to occupancy, use, or egress.
Structural work in conjunction with interior renovation to include partitions, ceiling, doors, and finishes as shown on drawings filed herewith. No change to occupancy, use, or egress.
Mechanical work in conjunction with interior renovation to include partitions, ceiling, doors, and finishes as shown on drawings filed herewith. No change to occupancy, use, or egress.
GENERAL CONSTRUCTION RELATED TO THE GAS INFRASTRUCTURE REPLACEMENT IN CELLAR. NO CHANGE IN EGRESS OR OCCUPANCY. WORK TO BE COMPLETED IN CONJUNCTION WITH M01087573.
ENTIRE BUILDING
GENERAL CONSTRUCTION IN RELATION TO GAS INFRASTRUCTURE REPLACEMENT IN CELLAR, GROUND FLOOR, SECOND FLOOR, AND THIRD FLOOR. NO CHANGE IN EGRESS OR OCCUPANCY. WORK TO BE COMPLETED IN CONJUNCTION WITH M01101663.
8785B BL - Installing 2 New Hot Water Condensing boilers as per plans. Gas piping filed under M00952896-S1. No change in egress use group or occupancy. Pro-cert is requested.
Propose modification of an existing sprinkler system on the 1st Floor and Mezzanine at 1175 Third Avenue NY NY all as per plans herewith filed. No change in use, egress, or occupancy filed under this application.
INSTALLATION OF TEMPORARY CUSTOM COLOR SIDEWALK SHED AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY
Installation of mechanical devices and ductwork is shown on the drawings filed herewith change in occupancy use or egress.
Interior renovation to include partitions, ceiling, doors, and finishes as shown on drawings. No change to occupancy, use, or egress.
Structural work on the 1st floor. No change in occupancy, use or egress.
8758B PL- Herewith filing for plumbing stub ins for future fixtures and install wall hose bibs as per plans. Connect existing gas service to new boilers filed under M00952896-S3. No change in egress use group or occupancy group. Pro cert requested.