20 MADISON STREET, Manhattan, NY, 10038 · New York City · 120 total events
NYCHA BOILER_BLDG#12_Remove and replace heat exchangers, and remove and replace hot water heating system connected to heat recovery system in existing tank room.
BLDG#1_Remove and replace heat exchangers, and connect heat recovery system to existing instantaneous hot water heating in the existing tank room.
Apt 12I — Eviction
INSTALLATION OF SUSPENDED SCAFFOLD AND MATERIAL HOIST FOR EXTERIOR FACADE REPAIRS AND FACADE INSPECTION. SUSPENDED SCAFFOLD AN MATERIAL HOIST SHALL COMPLY WITH CHAPTER 33 OF THE 2022 NYC BC. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION
INSTALLATION OF SUSPENDED SCAFFOLD AND MATERIAL HOIST FOR EXTERIOR FACADE REPAIRS AND FACADE INSPECTION. SUSPENDED SCAFFOLD AND MATERIAL HOIST SHALL COMPLY WITH CHAPTER 33 OF THE 2022 NYC BC. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLANS. SIDEWALK SHED SHALL COMPLY WITH CHAPTER 33 OF THE 2014 NYC BUILDING CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLANS. SIDEWALK SHED SHALL COMPLY WITH CHAPTER 33 OF THE 2014 NYC BUILDING CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
INSTALLATION OF TEMPORARY CHAIN LINK FENCE AS PER PLANS. CHAIN LINK FENCE SHALL COMPLY WITH CHAPTER 33 OF THE 2022 NYC BUILDING CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
INSTALLATION OF TEMPORARY CHAIN LINK FENCE AS PER PLANS. CHAIN LINK FENCE SHALL COMPLY WITH CHAPTER 33 OF THE 2022 NYC BUILDING CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
NYCHA BOILER_BLDG#3_Remove steam hot water storage tank and replace with new steam instantaneous water heater. Provide condensate piping from mechanical provided condensate pump to exist. bldg. drainage lines. Remove and replace exist. sump pumps.
NYCHA BOILER_BLDG#12_Remove steam hot water storage tank and replace with new steam instantaneous water heater. Provide condensate piping from mechanical provided condensate pump to exist. bldg. drainage lines. Remove and replace exist. sump pumps.
NYCHA BOILER_BLDG#6_Remove steam hot water storage tank and replace with new steam instantaneous water heater. Provide condensate piping from mechanical provided condensate pump to exist. bldg. drainage lines. Remove and replace exist. sump pumps.
Installation of temporary gas piping OSP servicing temporary boilers as per plans filed herewith.
BLDG#11_Remove and replace heat exchangers, and remove and replace hot water heating system connected to heat recovery system in existing tank room.
BLDG#11_Remove and replace heat exchangers, and remove and replace hot water heating system connected to heat recovery system in existing tank room.
BLDG#11_Remove and replace heat exchangers, and remove and replace hot water heating system connected to heat recovery system in existing tank room.
NYCHA BOILER_BLDG#5_Replace existing boilers with Con-Ed PRV Station, replace heat exchangers, connect heat recovery system to exist. instantaneous hot water heating in exist. boiler room and coal bunker, and construct new mezzanine for PRV Station.
NYCHA BOILER_BLDG#5_Replace existing boilers with Con-Ed PRV Station, replace heat exchangers, connect heat recovery system to exist. instantaneous hot water heating in exist. boiler room and coal bunker, and construct new mezzanine for PRV Station.
Temporary protection and dust control related to utility work osp as per plans filed herewith.
NYCHA BOILER_BLDG#5_Replace existing boilers with Con-Ed PRV Station, replace heat exchangers, connect heat recovery system to exist. instantaneous hot water heating in exist. boiler room and coal bunker, and construct new mezzanine for PRV Station.
Temporary protection and dust control related to utility work osp as per plans filed herewith.
Temporary support for concrete repairs on overhead beam and slab in cellar as per plans filed herewith.
NYCHA BOILER_BLDG#10_Remove steam hot water storage tank and replace with new steam instantaneous water heater. Provide condensate piping from mechanical provided condensate pump to exist. bldg. drainage lines. Remove and replace exist. sump pumps.
FACADE RESTORATION AS INDICATED ON DRAWINGS. NO CHANGE IN THE USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
FACADE RESTORATION AS PER INDICATED ON PLAN. NO CHANGE IN THE USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
NYCHA Boilers_BLDG#10_Remove and replace heat exchangers, and remove and replace hot water heating system connected to heat recovery system in existing tank room.
NYCHA Boilers_BLDG#10_Remove and replace heat exchangers, and remove and replace hot water heating system connected to heat recovery system in existing tank room.
NYCHA Boilers_BLDG#10_Remove and replace heat exchangers, and remove and replace hot water heating system connected to heat recovery system in existing tank room.
NYCHA BOILERS_BLDG#2_Provide connection from exist tempered water circulating line to new pre-heating plate with isolation check valve. Provide condensate piping from mech provided condensate pump to exist. bldg. drainage lines.
NYCHA BOILER_BLDG#1_Provide connection from exist tempered water circulating line to new pre-heating plate with isolation check valve. Provide condensate piping from mech provided condensate pump to exist. bldg. drainage lines.
NYCHA BOILER_BLDG#4_Provide connection from exist. tempered water circulating line to new pre-heating plate with isolation and check valve. Provide condensate piping from mechanical provided condensate pump to the exist. bldg. drainage lines.
NYCHA BOILER_BLDG#5_Demolish exist gas lines from exist boilers. Provide conn from exist tempered water circulating line to new pre-heating plate, condensate piping from condensate pump to the exist bldg sump pit, & new gas service for temp boilers.
NYCHA BOILER_BLDG#8_Remove steam hot water storage tank and replace with new steam instantaneous water heater. Provide condensate piping from mechanical provided condensate pump to exist. bldg. drainage lines. Remove and replace exist. sump pumps.
NYCHA BOILER_BLDG#9_Remove steam hot water storage tank and replace with new steam instantaneous water heater. Provide condensate piping from mechanical provided condensate pump to exist. bldg. drainage lines. Remove and replace exist. sump pumps.
NYCHA BOILER_BLDG#7_Remove steam hot water storage tank and replace with new steam instantaneous water heater. Provide condensate piping from mechanical provided condensate pump to exist. bldg. drainage lines. Remove and replace exist. sump pumps.
NYCHA BOILER_BLDG#9_Remove and replace heat exchangers, and remove and replace hot water heating system connected to heat recovery system in existing tank room.
NYCHA BOILER_BLDG#9_Remove and replace heat exchangers, and remove and replace hot water heating system connected to heat recovery system in existing tank room.
NYCHA BOILER_BLDG#9_Remove and replace heat exchangers, and remove and replace hot water heating system connected to heat recovery system in existing tank room.
NYCHA BOILER_BLDG#8_Remove and replace heat exchangers, and remove and replace hot water heating system connected to heat recovery system in existing tank room.
BLDG#7_Remove and replace heat exchangers, and remove and replace hot water heating system connected to heat recovery system in existing tank room.
NYCHA BOILER_BLDG#8_Remove and replace heat exchangers, and remove and replace hot water heating system connected to heat recovery system in existing tank room.
BLDG#7_Remove and replace heat exchangers, and remove and replace hot water heating system connected to heat recovery system in existing tank room.
NYCHA BOILER_BLDG#8_Remove and replace heat exchangers, and remove and replace hot water heating system connected to heat recovery system in existing tank room.
BLDG#7_Remove and replace heat exchangers, and remove and replace hot water heating system connected to heat recovery system in existing tank room.
BLDG#4_Remove and replace heat exchangers, and connect heat recovery system to existing instantaneous hot water heating in the existing tank room.
BLDG#2_Remove and replace heat exchangers, and connect heat recovery system to existing instantaneous hot water heating in the building.
BLDG#2_Remove and replace heat exchangers, and connect heat recovery system to existing instantaneous hot water heating in the building.
Installation of a temporary chain link construction fence filed in conjunction with M00516712 at NYCHA Building #5 as per plans filed herewith.
BLDG#1_Remove and replace heat exchangers, and connect heat recovery system to existing instantaneous hot water heating in the existing tank room.
BLDG#4_Remove and replace heat exchangers, and connect heat recovery system to existing instantaneous hot water heating in the existing tank room.