70 total · Page 1 of 4
FACADE REPAIRS NO CHANGE IN USE EGRESS OR OCCUPANCY
Interior apartment renovation of Apartment 24G per submitted plans. No change in use, egress or occupancy
SUSPENDED SCAFFOLD INSTALLATION FOR FACADE REPAIRS AND INSPECTIONS
INSTALLATION OF HEAVY DUTY SIDEWALK SHED. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION, ALL WORK TO COMPLY WITH CHAPTER 33 OF NYCBC.
PLUMBING AND SPRINKLER WORKS ON THE 2ND FLOOR COMMERCIAL SPACE. SCOPE OF WORKS AS SHOWN IN PLANS. NO CHANGE IN EGRESS, OCCUPANCY OR USE.
MECHANICAL WORKS ON THE 2ND FLOOR COMMERCIAL SPACE. NO CHANGE IN EGRESS, OCCUPANCY OR USE.
INTERIOR NON-STRUCTURAL ALTERATION OF APARTMENT UNIT 12A. REPLACEMENTOF FIXTURES, FINISHES, AND LIGHTING. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
INTERIOR NON-STRUCTURAL ALTERATION OF APARTMENT UNIT 9H. REPLACEMENTOF FIXTURES, FINISHES, AND LIGHTING. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
INTERIOR NON-STRUCTURAL ALTERATION OF APARTMENT UNIT 7B. REPLACEMENT OF FIXTURES, FINISHES, AND LIGHTING. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
INTERIOR ALTERATION OF RESIDENTIAL UNIT 6A AND 9C WITH PLUMBING WORK. RELOCATION, REPLACEMENT, AND NEW PLUMBING FIXTURES. NO CHANGE IN USE,OCCUPANCY OR EGRESS.
INTERIOR NON-STRUCTURAL ALTERATION OF APARTMENT UNITS 6A AND 9C. REPLACEMENT OF FIXTURES, FINISHES, AND LIGHTING. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
INTERIOR NON-STRUCTURAL ALTERATION OF APARTMENT UNIT 20H. REPLACEMENTOF FIXTURES, FINISHES, AND LIGHTING. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
INTERIOR NON-STRUCTURAL ALTERATION OF APARTMENT UNIT 22J. REPLACEMENT OF FIXTURES, FINISHES, AND LIGHTING. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
Extend Existing Hood at existing prep area on 1st Floor. No change in use, egress or occupancy.
GENERAL CONSTRUCTION PERTAINING TO THE RESTORATION OF HALLWAY VENTILATION SYSTEM. NO CHANGE IN EGRESS OR OCCUPANCY.
PLUMBING AND SPRINKLER WORKS ON THE 2ND FLOOR COMMERCIAL SPACE. SCOPE OF WORKS AS SHOWN IN PLANS. NO CHANGE IN EGRESS, OCCUPANCY OR USE.
RESTORATION OF HALLWAY VENTILATION SYSTEM. THE HVAC UNITS SHALL BE INSTALLED ON THE ROOF VIA STREET CRANE. NO CHANGE IN EGRESS OR OCCUPANCY.
RESTORATION OF HALLWAY VENTILATION SYSTEM. THE HVAC UNITS SHALL BE INSTALLED ON THE ROOF VIA STREET CRANE. NO CHANGE IN EGRESS OR OCCUPANCY.
INTERIOR RENOVATION OF DAY CARE CENTER ON THE 2ND FLOOR. SCOPE OF WORKS AS SHOWN IN PLANS. NO CHANGE IN EGRESS, OCCUPANCY OR USE.
Plumbing and sprinkler work related too build out of new supermarket.