146 EAST 123 STREET— Violations & Issues
Top Violations
Top 311 Complaints
§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE BATHROOM LOCATED AT APT 1B, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST
Apt: 1B
§27-2104(B) HMC POST A PROPER NOTICE REGARDING RENT STABILIZATION LAW, IN A FORM APPROVED BY THE COMMISSIONER, IN A CONSPICUOUS LOCATION WITHIN THE COMMON AREA AT THE BUILDINGS ENTRANCE. FOR MORE INFORMATION ABOUT SIGNAGE REQUIREMENTS, PLEASE VISIT: HTTPS://WWW.NYC.GOV/SITE/HPD/SERVICES-AND-INFORMATION/REQUIRED-SIGNAGE.PAGE
§ 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE HINGES IN THE ENTRANCE LOCATED AT APT 1B, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST
Apt: 1B
§ 27-2026 ADM CODE REPAIR THE LEAKY AND/OR DEFECTIVE FAUCETS AT SINK IN THE KITCHEN LOCATED AT APT 1B, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST
Apt: 1B
§ 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF SCALDING HOT WATER ABOVE 130 DEGREES FAHRENHEIT AT BATHTUB AND WASH BASIN IN THE ENTIRE APARTMENT LOCATED AT APT 1B, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST
Apt: 1B
§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 10 SQUARE FEET AT THE CEILING IN THE BATHROOM LOCATED AT APT 1B, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST
Apt: 1B
§ 27-2026 ADM CODE REPAIR THE LEAKY AND/OR DEFECTIVE FAUCETS AT BATHTUB IN THE BATHROOM LOCATED AT APT 4A, 5th STORY, 1st APARTMENT FROM EAST AT SOUTH
Apt: 4A
§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC FLOOR TILES IN THE BATHROOM LOCATED AT APT 4A, 5th STORY, 1st APARTMENT FROM EAST AT SOUTH
Apt: 4A
§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT CEILING AND ALL WALLS IN THE 4th ROOM FROM NORTH LOCATED AT APT 4A, 5th STORY, 1st APARTMENT FROM EAST AT SOUTH
Apt: 4A
§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT CEILING AND ALL WALLS IN THE 3rd ROOM FROM NORTH LOCATED AT APT 4A, 5th STORY, 1st APARTMENT FROM EAST AT SOUTH
Apt: 4A