8 total
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY. THE SIDEWALK SHED IS AT THE BUILDING FACE AT THE WEST 142ND STREET ELEVATION.
PLUMBING WORK FILED IN CONJUNCTION WITH RENOVATION OF 5-STORY NYCHA MULTIPLE DWELLING AS PART OF THE NYCHA PACT RENOVATION: INSTALLATION OF NEW SANITARY, STORM, DOMESTIC WATER, SANITARY VENT AND GAS PIPING. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
INSTALL HOIST IN ORDER TO PERFORM EXTERIOR FACADE REPAIRS. SIDEWALK SHED FILED UNDER SEPARATE APPLICATION
INTERIOR RENOVATION OF 5-STORY NYCHA MULTIPLE DWELLING AS PART OF THE NYCHA PACT RENOVATION: DIRECT REPLACEMENT OF FINISHES THROUGHOUT, DIRECT REPLACEMENT OF KITCHEN, BATHROOM, DOORS AND WINDOWS. NO CHANGES TO USE, EGRESS, OR OCCUPANCY.
LIMITED EXTERIOR REPAIR & ROOF REPLACEMENT IN CONJUNCTION WITH RENOVATION OF 5-STORY NYCHA MULTIPLE DWELLING THROUGHOUT. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
INTERIOR RENOVATION OF 5-STORY NYCHA MULTIPLE DWELLING AS PART OF THE NYCHA PACT RENOVATION: REPLACEMENT OF EXISTING KITCHEN AND BATHROOM FXITURES ON EXISTING ROUGH-IN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
INSTALLATION OF NEW BOILER FILED IN CONJUNCTION WITH RENOVATION OF 5-STORY NYCHA MULTIPLE DWELLING THROUGHOUT. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
MECHANICAL WORK IN CONJUNCTION WITH RENOVATION OF 5-STORY NYCHA MULTIPLE DWELLING THROUGHOUT: INSTALLATION OF NEW AIR-CONDITIONING SYSTEMS, REPLACEMENT OF VENTILATION SYSTEMS AND MISCELLANCEOUS HVAC WORK; NO CHANGE TO USE, EGRESS, OR OCCUPANCY.