141 NAGLE AVE— Violations & Issues
Top Violations
§ 300 M/D LAW FILE PLANS AND APPLICATION AND LEGALIZE THE FOLLOWING ALTERATION OR RESTORE TO THE LEGAL CONDITION EXISTING PRIOR TO THE MAKING OF SAID ALTERATION CONSISTING OF STORAGE SPACE CREATED UNDER PUBLIC HALL STAIR USING WOOD PANELS AND STUDS FROM FLOOR TO SOFFIT WITH DOOR, AT WEST SECTION, AT PUBLIC HALL, 1st STORY
§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING IN THE KITCHEN LOCATED AT APT 5B, 5th STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION ''NORTH''
Apt: 5B
§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING AND SOUTH WALL IN THE PRIVATE HALLWAY LOCATED AT APT 5B, 5th STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION ''NORTH''
Apt: 5B
§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING IN THE 3rd ROOM FROM EAST LOCATED AT APT 5B, 5th STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION ''NORTH''
Apt: 5B
§ 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK OVER CEILING IN THE 3rd ROOM FROM EAST LOCATED AT APT 5B, 5th STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION ''NORTH''
Apt: 5B
§ 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK OVER CEILING IN THE KITCHEN LOCATED AT APT 5B, 5th STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION ''NORTH''
Apt: 5B
§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE 1st ROOM FROM NORTH AT EAST LOCATED AT APT 5F, 5th STORY, 1st APARTMENT FROM NORTH AT EAST
Apt: 5F
§ 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK OVER THE CEILING IN THE 1st ROOM FROM NORTH AT EAST LOCATED AT APT 5F, 5th STORY, 1st APARTMENT FROM NORTH AT EAST
Apt: 5F
§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILING AND SOUTH WALL AT 1st PUBLIC HALL BULKHEAD FROM NORTH
§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDANT MATERIAL CEILING AT PUBLIC HALL, 5th STORY