14 total
Plumbing work at apt #5F at 5th floor indicated on drawing filed herewith No change in Use Egress or Occupancy under this application
INTERIOR RENOVATION WORK AT UNIT #PH1 & 6B INCLUDING WALL PARTITION REPAIR, REPLACE TILE FINISH AND NEW PAINT. THER IS NO CHANGE IN USE, MEANS OF EGRESS. OR OCCUPANCY UNDER THIS APPLICATION.
NEW PLUMBING WORK TYPE FILED IN CONJUNCTION WITH DOB NOW GC APPLICATION #M00806724-I1. INSTALLATION OF (1) WASHER & (1)D.W. AND REPLACEMENT OF (1) SINK & (1) LAV., RELOCATION OF (1) W.C. & (1) SHOWER, AND REMOVAL OF (2) GAS METER & (2) RANGE AS PER PLAN.
General Construction at apt #5F at 5th floor indicated on drawings filed herewith No change in Use Egress or occupancy under this application
General construction at apt #4L on the 4th floor indicated on drawings filed herewith. No change in Use Egress or Occupancy under this application
General construction at apt #1D at the 1st floor indicated on drawings filed herewith. No change in Use Egress or occupancy under this application.
Replace existing plumbing fixtures with new and installation of new bathroom fixtures as per plan. There is no change in Use, Means of Egress, or Occupancy under this application.
INTERIOR RENOVATION WORK AT 5TH FLOOR TO CONNECT UNIT #5J AND 5K AS PER PLAN. REMOVAL AND INSTALLATION OF INTERIOR PARTITION WALL, DOORS AND FLOOR FINISH WITH PAINT FINISH. THERE IS NO CHANGE IN USE, OCCUPANCY, OR MEANS OF EGRESS UNDER THIS APPLICATION.
Installation of new antennas and kickback on the rooftop (T-Mobile - NY02534A) as per plans. All work is in compliance with TPPN 5/98 & BB 11/21. No change to use, egress or occupancy.
DISH-Installation of 3 new antenna sectors including 6 RRH units, 1 GPS unit on roof. Install 1 new equipment cabinet on wall mount. Related service connection on ground floor to roof. All in conformance with TPPN 5/98.
INTERIOR RENOVATION WORK INCLUDING NEW PARTITION WALL, FINISH WORK AT APT UNIT #4B AS PER PLAN. THERE IS NO CHANGE IN USE, OCCUPANCY, OR MEANS OF EGRESS UNDER THIS APPLICATION.
CONSTRUCTION OF NEW ELEVATOR SHAFT. NO CHANGE OF USE, EGRESS OR OCCUPANCY IS INVOLVED- PAA TO REVISE SCOPE OF WORK.
REPLACE, REMOVE AND RELOCATE PLUMBING FIXTURES. NO CHANGE IN USE, EGRESS OR OCCUPANCY IS INVOLVE.
REPLACE EXISTING HVAC SYSTEM AND AIR HANDLERS, INSTALL DUCTWORK AS PER PLANS. NO CHANGE OF USE, EGRESS OR OCCUPANCY IS INVOLVE.