32 total · Page 1 of 2
TWO (2) THREE-FIXTURE BATHROOM, ONE (1) WET BAR AREA (2-FIXTURE) AND LAUNDRY ROOM
ALTERATION OF EXISTING SPACE FOR NEW OFFICE LAYOUT
SELECTED DEMOLITION OF 4 EXISTING WINDOWS ALONG AN INTERIOR COURT TO BE REPLACED WITH 3 NEW WINDOWS AND 1 DOOR+ SIDELITE. SELECTIVE DEMO OF NON-LOAD BEARING EXTERIOR WALL FOR NEW DOOR.CONSTRUCTION OF NEW METAL CONVENIENCE STAIR TO INTERIOR COURT.
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE.LIVE LOAD 300PSF.
COMBINATION OF APT 12D AND 12E ON 12TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, OCCUPANCY, OR EGRESS.
MODIFICATION OF APT 5H ON 5TH FLOOR AS PER PLANS FILED HEREWITH.
Modification of Apartment 8C on 8th floor as per plans filed herewith.
INSTALLATION OF HEAVY DUTY SIDEWALK SHED FOR REMEDIAL REPAIRS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION. SIDEWALK SHED SHALL COMPLY WITH CHAPTER 33 OF THE 2014 NYC BUILDING CODE.
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE.LIVE LOAD 300PSF.
Modification to existing sprinkler system on the cellar and first floor to include 73 new sprinkler heads on the first floor as per plans filed herewith.
Modification of apartment 7C on 7th floor as per plans filed herewith.
Plumbing fixtures replacement on existing roughing for apt 6F as per plans filed herewith
Plumbing fixtures in Apt 3F to be replaced on existing roughing as per plans filed herewith.
Plumbing fixtures replacement on existing roughing for apt 2B & 9L as per plans filed herewith.
Plumbing fixtures in Apt 4D & Apt 3B to be replaced on existing roughing as per plans filed herewith.
Plumbing fixtures in Apt 3E to be replaced on existing roughing as per plans filed herewith.
Plumbing fixtures replacement on existing roughing for apt 3B & apt 10C as per plans filed herewith
Plumbing fixtures replacement on existing roughing for apt 7C, 8B & apt 11B as per plans filed herewith
Plumbing fixtures in Apt 8C to be replaced on existing roughing as per plans filed herewith.
#8464 - Interior renovation of existing office space. No change in egress, use ,or occupancy.