13 total
Filing for facade repairs as per plans filed herewith. No change in use occupancy or egress.
Suspended Scaffold Installation for facade repairs and inspections
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
INTERIOR GENERAL CONSTRUCTION FOR INSTALLATION OF NEW FIRE-RATED ACCESS PANELS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Renovation of the interiors to include removal of selected non-load-bearing partitions, gut renovation of one kitchen and 4.5 bathrooms, new floor finishes, and selected new ceilings. No change in use egress nor occupancy.
Renovation of 4 bathrooms, 1 powder room, 1 make up counter and 1 kitchen.
INSTALLATION OF A HEAVY DUTY SIDEWALK SHED AS PER PLANS DURING GENERAL CONSTRUCTION WORK. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED TO COMPLY WITH CHAPTER 33 OF NYC BUILDING CODE OF 2014.
INTERIOR RENOVATION TO COMBINE EXISTING UNITS A & B AT THE 14th FLOOR AS ALLOWED BY TPPN#3/97 TO CREATE ONE UNIT.
Pluming modification in conjunction with GC job #M00743578-I1
Installation of toilet exhaust for new powder room in conjunction with GC job #M00743578-I1
INTERIOR RENOVATION TO EXISTING APARTMENT #7N.
modifications to existing plumbing system
Interior renovations to apartment