116 PINEHURST AVENUE, Manhattan, NY, 10033 · New York City · 32 total events
INSTALLATION OF NEW SPLIT HEAT PUMP SYSTEM IN APARTMENT E2. NO CHANGE IN USE, EGRESS, OR OCCUPANCY
§27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27-2097 AND IS THEREFORE SUBJECT TO CIVIL PENALTIES, PROHIBITED FROM CERTIFYING VIOLATIONS, AND DENIED THE RIGHT TO RECOVER POSSESSION OF PREMISES FOR NONPAYMENT OF RENT UNTIL A VALID REGISTRATION STATEMENT IS FILED.
§27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27-2097 AND IS THEREFORE SUBJECT TO CIVIL PENALTIES, PROHIBITED FROM CERTIFYING VIOLATIONS, AND DENIED THE RIGHT TO RECOVER POSSESSION OF PREMISES FOR NONPAYMENT OF RENT UNTIL A VALID REGISTRATION STATEMENT IS FILED.
Roof replacement and masonry repair as per plans filed herewith. No change in use, egress or occupancy.
Proposed work includes the repair of an existing lintel at the fifth-floor exterior facade outside of apartment G-54, as per plans filed herewith. No change in use, egress, or occupancy.
FILE SUSPENDED SCAFFOLD OUTRIGGER SYSTEMS FOR FACADE RESTORATION AND INSPECTION.
FILE SUSPENDED SCAFFOLD OUTRIGGER SYSTEMS FOR FACADE RESTORATION AND INSPECTION.
FILE SUSPENDED SCAFFOLD OUTRIGGER SYSTEMS FOR FACADE RESTORATION AND INSPECTION.
FILE SUSPENDED SCAFFOLD OUTRIGGER SYSTEMS FOR FACADE RESTORATION AND INSPECTION.
installation of pipe scaffolding. no change in use, occupancy or egress. all work to comply with chapter 33 of nycbc.
INSTALLATION OF HEAVY DUTY SIDEWALK SHED. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION, ALL WORK TO COMPLY WITH CHAPTER 33 OF NYCBC.
Roof replacement and masonry repair as per plans filed herewith. No change in use, egress or occupancy.
(A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS.
INTERIOR RENOVATION AND COMBINATION OF EXISTING APARTMENTS S1 AND S2 AS PER TPPN #03/97 (REMOVAL OF PLUMBING FIXTURE). NO CHANGE IN USE, EGRESS OR OCCUPANCY.
INTERIOR RENOVATION AND COMBINATION OF EXISTING APARTMENTS S1 AND S2 AS PER TPPN #03/97. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
WINDOW GUARD BROKEN/MISSING
INSTALLATION OF NEW SPLIT HEAT PUMP SYSTEM IN COMBINED APARTMENTS T10-T11-T12
HORIZONTAL COMBINATION OF EXISTING APARTMENTS J61 & J65 AS PER TPPN #03/97. DEMO AND CONSTRUCT NON-STRUCTURAL INTERIOR PARTITIONS, FINISHES AND CABINETRY. PLUMBING FILED UNDER SUBSEQUENT APPLICATION. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
PLUMBING WORK FILED IN CONJUNCTION WITH COMBINATION OF EXISTING APARTMENTS J61 & J65 UNDER TPPN #03/97. CAP AND REMOVE KITCHEN AT APT J65. RENOVATE EXISTING KITCHEN AT APT J61. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
PLUMBING WORK TO COMBINE APTS. B-63 & B-64 PER TPPN 3/97 ON THE 6TH FLOOR ON AN EXISTING 6 STORY MULTIPLE DWELLING BUILDING. ALTERATIONS TO INCLUDE CAPPING AND REMOVING GAS VALVE, GAS PIPING AND REMOVAL OF GAS STOVE ON APARTMENT B-64.
WORK TO COMBINE APTS. B-63 & B-64 PER TPPN 3/97 ON THE 6TH FLOOR ON AN EXISTING 6 STORY MULTIPLE DWELLING BUILDING. NO CHANGE TO USE, EGRESS, OCCUPANCY, OR ZONING UNDER THIS APPLICATION.
Interior renovation of apartment as per plans
interior renovation of apartment as per plans
REPLACEMENT OF SUPPLY & RETURN HEATING PIPES WITHIN VAULT, NEW SUPPORTS, BRANCHING, FITTINGS, VALVES, & CONNECTIONS TO EXISTING BUILDINGS. NO WORK OUTSIDE OF VAULT OR WITHIN THE BUILDING OR BOILER ROOM. PIPE VAULT WITHIN 150, 156, 168, 174 PINEHURST
WORK TO COMBINE APTS. B-33 & B-34 ON THE 3RD FLOOR ON AN EXISTING 6 STORY MULTIPLE DWELLING BUILDING. NO CHANGE TO USE, EGRESS, OCCUPANCY, OR ZONING UNDER THIS APPLICATION.
APARTMENT ONLY
APARTMENT ONLY
APARTMENT ONLY
TOILET
Existing gas booster pump to be removed. Gas service to be upgraded to medium pressure gas line by ConEd w/ new gas meter, new regulators, new gas piping, and new connections to existing boilers. (4) existing boiler outlets to be replaced.
Proposed renovation to one bathrooms and the removal of one kitchen for an apartment combination.
INSTALLATION OF PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.