7 total
RELOCATE PLUMBING FIXTURES WITH NEW (1 LAV, 1 WC, 1 SHOWER, 1 SINK, 1 W/M, 1 DW) APT 6 AND (1 WC, 1 LAV, 1 SINK) APT 5. CAP AND REMOVE (1 TUB) IN APT 5. INSTALL NEW PLUMBING FIXTURES (1 WC, 1 LAV, 1 SHOWER, 1 DW, 1 W/M) APT 5.
GENERAL CONSTRUCTION TO RENOVATE APT 5 (RENAME 5A) AND 6 ON THE 4TH FLOOR. WORK WILL INCLUDE NEW PARTITIONS AND FINISHES, NEW FLOORING, AND NEW PLUMBING FIXTURES. NO CHANGE IN USE, EGRESS, OR OCCUPANCY UNDER THIS FILING.
HEREWITH FILE PLANS FOR INTERIOR RENOVATION OF AN EXISTING STORE. WORK WILL INVOLVE THE INSTALLATION OF GAS COOKING EQUIPMENT. NO CHANGE IN USE, EGRESS, AND OCCUPANCY.
HEREWITH FILE PLANS FOR INTERIOR RENOVATION OF EXISTING STORE. WORK WILL INVOLVE GENERAL CONSTRUCTION FOR MINOR INTERIOR PARTITIONS, NEW CEILING AND FLOOR AND NEW FINISHES THROUGHOUT. NO CHANGE IN USE, EGRESS AND OCCUPANCY.
HEREWITH FILE PLANS FOR INTERIOR RENOVATION OF EXISTING STORE. WORK WILL INVOLVE GENERAL CONSTRUCTION FOR MINOR INTERIOR PARTITIONS, NEW CEILING AND FLOOR AND NEW FINISHES THROUGHOUT. NO CHANGE IN USE, EGRESS AND OCCUPANCY.
REPLACE PLUMBING FIXTURES WITH NEW AT EXISTING ROUGHING (1 WC, 1 LAV), RELOCATE PLUMBING FIXTURES WITH NEW (1 SINK), AND INSTALL NEW PLUMBING FIXTURES (1 SHOWER, 1 W/M, 1 DW) AT APT 3 AT 3RD FLOOR
application filing to legalize direct replaced existing condensing unit to address ecb violation#39004848Z at rear as per plan. no change of use, egress and occupancy.