6 total
REPLACEMENT OF DOMESTICWATER HEATER, REPLACEMENT OF DOMESTIC BOOSTER PUMP, INSTALLATION OF PRIMARY BACKFLOW PREVENTER, INSTALLATION OF CIRCUIT SOLVERS, REPLACEMENT OF PLUMBING FIXTURES AS PER OT PLANS, RELATED WORK AND INSULATION FOR ALL.
REPLACEMENT OF EXHAUST FNAS, AIR OUTLETS, BOILERS, BOILER VENTING, AND HOT WATER PIPING ACCESSORIES.. NO CHANGE TO USE EGRESS OR OCCUPANCY.
MASONRY RESTORATION AND ROOF REPLACEMENT, WATERPROOFING INSTALLATION, LINTEL REPLACEMENT, WINDOWSILL REPLACEMENT, LOCALIZED MASONRY REPAIR, STUCCO FINISH REPLACEMENT, PARAPET REBUILDING, COATING INSTALLATION,LOCALIZED INTERIOR RENOVATIONS.
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 LBS PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
BOILER REPLACEMENT AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.