102 EAST 22 STREET, Manhattan, NY, 10010 · New York City · 21 total events
INTERIOR ALTERATION OF PENTHOUSE UNIT B (11B) WITH PLUMBING WORK. RELOCATION, REPLACEMENT, AND NEW PLUMBING FIXTURES. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
Minor construction work for apartment updates Furring of interior wall and built-in millwork, reframe hallway door.
INTERIOR NON-STRUCTURAL ALTERATION OF PENTHOUSE UNIT B (11B). REPLACEMENT OF FIXTURES, FINISHES, AND LIGHTING. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
ENTIRE BUILDING
ENTIRE BUILDING
ENTIRE BUILDING
ENTIRE BUILDING
ENTIRE BUILDING
ENTIRE BUILDING
ENTIRE BUILDING
ENTIRE BUILDING
ENTIRE BUILDING
ENTIRE BUILDING
APARTMENT ONLY
APPLICATION FILED HEREWITH TO COMBINE APARTMENTS 2AB AND 2C AS PER TPPN 3/97. NO CHANGE IN USE, EGRESS AND OCCUPANCY.
Filing application to combine units 4F and 4G on the 4th floor as per TPPN 3/97. Work to include removal of interior non-load bearing partitions and finish work. Plumbing to be filed separately. No change to use, egress or occupancy.
HEREWITH FILE PLUMBING WORK TYPE INCONJUNCTION WITH JOB #M00588083. NO CHANGE IN USE, EGRESS AND OCCUPANCY.
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AND PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE.LIVE LOAD 300PSF.
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AND PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE.LIVE LOAD 300PSF.
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. LIVE LOAD 300PSF.
FAILED TO FILE FISP CYCLE 8B TECHNICAL REPORT BY 02/21/2018