5 total
INTERIOR RENOVATION ON 5TH FLOOR APT. (5A, 5C, 5D) OF AN EXIST'G 5 STORY BRICK BUILDING. RELOCATE/REPLACE/NEW KITCHEN AND BATHROOM FIXTURES PER PLAN. NO CHANGE IN USE, MEANS OF EGRESS OR OCCUPANCY.
RENOVATION ON 5RD FLOOR APT. (5A, 5C, 5D) OF AN EXIST'G 5 STORY BRICK BUILDING. REPAIR/REPLACE/NEW PARTITION, DOOR, CEILING, FLOOR, WINDOW, PAINTING AS PER PLAN. NO CHANGE IN USE, MEANS OF EGRESS OR OCCUPANCY.
REMOVING EXISTING TEMPORARY SHORING FROM INSIDE THE APARTMENTS 1C THROUGH 5C ( C-LINE, VACANT ), PROVIDING NEW TYPE 'X' GYPSUM BOARD CEILING TO REPLACE MISSING/EFFECTED DUE TO THE SHORING, RESTORE FLOOR, SCRAP & PAINT ENTIRE APARTMENTS ( 1C-5C).
REMOVE AND REPLACE LOOSE BRICKS APPROX. 160 S. FT AT EXPOSURE 4 WALL (COLLAPSED SECTION AT CELLAR). EMPLOY STRUCTURAL REPAIRS TO ALL CRACKS. RAKE AND POINT APPRX.3600 SF ON WALL
INSTALL TEMPORARY SHORING AT CELLAR TO 5TH FLOOR AS PER PLAN.