23 total · Page 1 of 2
MINOR PLUMBING WORKS AT APT 1834 ON THE 18TH FLOOR. SCOPE OF WORK AS SHOWN IN PLANS. NO CHANGE IN EGRESS, OCCUPANCY OR USE.
INSTALL NEW PARTITIONS AT APT 1834 ON THE 18TH FLOOR. SCOPE OF WORK AS SHOWN IN PLANS. NO CHANGE IN EGRESS, OCCUPANCY OR USE.
PLUMBING WORK IN CONJUNCTION WITH MINOR INTERIOR RENOVATION OF EX APT PH4. REPLACEMENT OF PLUMBING FIXTURES IN EXISTING LOCATIONS. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
MINOR INTERIOR RENOVATION OF EX APT PH4. DEMO AND CONSTRUCT NEW INTERIOR FINISHES AND DOORS. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
Filing for plumbing alterations at units PH1 & PH 2 as per plans. No change in use, egress or occupancy. Superceding Plumbing work filed under application 123135160, which will be withdrawn.
PLUMBING WORK FILED IN CONJUNCTION WITH ALTERATIONS TO EXISTING APARTMENT 6P ON THE 22ND & 23RD FLOORS. INSTALL PLUMBING FIXTURES AND RELATED PIPING.
Filing mechanical work as per plans for units PH1 & PH2. No change in use, egress or occupancy. Superceding Mechanical scope under application 123184794. which will be withdrawn.
ARCHITECTURAL MODIFICATIONS TO PENTHOUSE UNITS 1 & 2 AS PER PLANS. SUPERCEDING APPLICATION # 123135160 TO BE WITHDRAWN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
PLUMBING WORK FILED IN CONJUNCTION WITH ROOFTOP HOT TUB INSTALLATION.
INSTALL HOT TUB ON THE EXISTING ROOF TERRACE ACESSORY TO PENHOUSE APT PH6. NO CHANGE TO USE, EGRESS OR OCCUPANCY. RELATED STRUCTURAL AND PLUMBING FILED UNDER SUBSEQUENT APPLICATIONS.
STRUCTURAL DUNNAGE WORK RELATED TO ROOFTOP HOT TUB INSTALLATION. INSTALL STRUCTURAL STEEL SUPPORT FRAMING AND MASONRY INFILL. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
APPLICATION FILED FOR THE INSTALLATION OF 6 NEW THRU WALL A/C UNITS AND OPENINGS IN EX. APTS 628, 635, 829, 1605, 1933. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
MECHANICAL WORK FILED IN CONJUNCTION WITH RENOVATION OF APARTMENT 6P ON THE 22nd & 23rd FLOORS. INSTALL SPLIT A/C SYSTEM, RADIATORS. INSTALL ELECTRIC RADIANT HEATING IN BATHROOMS.
RENOVATE APARTMENT 6P ON THE 22nd & 23rd FLOORS. DEMO & CONSTRUCT NON-BEARING INTERIOR PARTITIONS, FINISHES, CABINETRY. ROOF TERRACE WORK. PLUMBING & MECH WORK FILED SEPARATELY. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. LIVE LOAD 300 PSF
APPLICATION FILED FOR THE INSTALLATION OF 32 NEW THRU WALL A/C UNITS AND OPENINGS ON FLOORS 3-18 and 21st FLOOR, IN 32 APTS TOTAL. NO CHANGE TO USE, EGRESS OR OCCUPANCY. SEE PW-1 'LOCATION INFORMATION' AND 'COMMENTS' FOR LIST OF APT NUMBERS.
INSTALLATION OF NEW HVACS SYSTEMS
NEW PARTITION AND INSTALLATION OF WALK-IN REFRIGERATOR. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
PLUMBING SCOPE OF WORK IN-CONJUNCTION WITH GENERAL CONSTRUCTION INTERIOR RENOVATION APPLICATION FOR COMBINING CO-OP UNITS (1129 & 1130) ON THE SAME FLOOR (TO COMPLY WITH TPPN 03/97).