938 BUSHWICK AVENUE— Violations & Issues
Top Violations
Top 311 Complaints
§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT EAST WALL IN THE 1st ROOM FROM NORTH AT WEST LOCATED AT APT 3F, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH
Apt: 3F
§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING IN THE BATHROOM LOCATED AT APT 7, 4th STORY, 1st APARTMENT FROM WEST AT NORTH
Apt: 7
§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING IN THE 3rd ROOM FROM NORTH LOCATED AT APT 7, 4th STORY, 1st APARTMENT FROM WEST AT NORTH
Apt: 7
§ 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK ABOVE THE CEILING IN THE 3rd ROOM FROM NORTH LOCATED AT APT 7, 4th STORY, 1st APARTMENT FROM WEST AT NORTH
Apt: 7
§ 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK ABOVE THE CEILING IN THE BATHROOM LOCATED AT APT 7, 4th STORY, 1st APARTMENT FROM WEST AT NORTH
Apt: 7
§ 27-2021 ADM CODE PROVIDE SUFFICIENT, PROPER AND SEPARATE METAL RECEPTACLES FOR THE DEPOSIT OF GARBAGE, RUBBISH AND OTHER WASTE MATERIAL AND ARRANGE FOR COLLECTION AND DISPOSAL OF SUCH MATERIAL.
§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 10 SQ.FT AT CEILING IN THE 1st ROOM FROM EAST AT SOUTH LOCATED AT APT 3F, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST
Apt: 3F
(A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS.
§ 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE KITCHEN LOCATED AT APT 7, 4th STORY, 1st APARTMENT FROM WEST AT NORTH
Apt: 7
§ 27-2029 ADM CODE PROVIDE AN ADEQUATE SUPPLY OF HEAT FOR THE APARTMENT IN THE ENTIRE APARTMENT LOCATED AT APT 7, 4th STORY, 1st APARTMENT FROM WEST AT NORTH
Apt: 7