Drop this scorecard into a tenant guide, blog post, or wiki. It updates itself as new violations are filed.
Brooklyn · March 2026
Best & worst months to sign a lease
Potential savings: ~8% by timing your move to February.
Asking rent per bedroom type — switch tabs to see each with effective (concession-net) rent.
Monthly counts over the last 7 years · all data sources
§ 27-2026 ADM CODE REMOVE ALL OBSTRUCTIONS FROM WATER CLOSET ... [AT LOWER LEVEL] IN THE 1st BATHROOM FROM NORTH LOCATED AT APT 1B, 1st STORY, 1st APARTMENT FROM EAST AT SOUTH
§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... AT NORTH AND EAST WALLS (APPROX. 6 SQ. FT.) [AT LOWER LEVEL] IN THE 1st ROOM FROM NORTH AT WEST LOCATED AT APT 1B, 1st STORY, 1st APARTMENT FROM EAST AT SOUTH ORIGINAL VIOLATION 15439940 ISSUED 24-OCT-22 HAS BEEN UPGRADED TO CLASS B PER ADMINISTRATIVE CODE §27-2017.3a(3)(a) or (b).
(A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS.
Bed-Stuy is Brooklyn's brownstone capital — block after block of stunning Victorian and Romanesque row houses, many beautifully restored. The neighborhood's Black cultural heritage runs deep (Biggie grew up here), and the restaurant scene on Tompkins and Lewis Avenues has exploded.
HPD Class C Violation — § 27-2026 ADM CODE REMOVE ALL OBSTRUCTIONS FROM WATER CLOSET ... [AT LOWER LEVEL] IN THE 1st BATHROOM FROM NORTH LOCATED
HPD Class B Violation — § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... AT NORTH AND EAST WALLS (APPROX. 6
HPD Class A Violation — (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR