902 44TH ST— Violations & Issues
Top Violations
§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING, EAST WALL IN THE 1st ROOM FROM NORTH AT WEST LOCATED AT APT A3, 1st STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION ''NORTHWEST''
Apt: A3
§ 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE 3rd ROOM FROM NORTH LOCATED AT APT A3, 1st STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION ''NORTHWEST''
Apt: A3
§ 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD-PAINT THAT IS PEELING OR ON A DETERIORATED SUBSURFACE AND EITHER TESTED INCONCLUSIVE FOR LEAD CONTENT AT 0.5MG/CM2 OR TESTED POSITIVE FOR LEAD CONTENT ON A METAL OR CERAMIC SUBSTRATE AS SET FORTH IN (28 RCNY §11-07(b)) USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(b)(2). SOUTH WALL, 2nd WINDOW FRAME FROM SOUTH AT WEST WALL IN THE 1st ROOM FROM NORTH AT WEST LOCATED AT APT A3, 1st STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION ''NORTHWEST''
Apt: A3
§ 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD-PAINT THAT IS PEELING OR ON A DETERIORATED SUBSURFACE AND EITHER TESTED INCONCLUSIVE FOR LEAD CONTENT AT 0.5MG/CM2 OR TESTED POSITIVE FOR LEAD CONTENT ON A METAL OR CERAMIC SUBSTRATE AS SET FORTH IN (28 RCNY §11-07(b)) USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(b)(2). NORTH WALL, SOUTH WALL IN THE 2nd ROOM FROM NORTH AT WEST LOCATED AT APT A3, 1st STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION ''NORTHWEST''
Apt: A3
§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE PRIVATE HALLWAY , THE 3rd ROOM FROM NORTH LOCATED AT APT A3, 1st STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION ''NORTHWEST''
Apt: A3
§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT EAST WALL, 1st WINDOW FRAME FROM SOUTH AT WEST WALL, BASEBOARD AT SOUTH WALL, 1st DOOR FRAME FROM NORTH AT EAST WALL, CEILING IN THE 2nd ROOM FROM NORTH AT WEST LOCATED AT APT A3, 1st STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION ''NORTHWEST''
Apt: A3
§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT 1st DOOR FRAME FROM NORTH AT EAST WALL, BASEBOARD AT WEST WALL, 1st DOOR FROM NORTH AT EAST WALL, 1st CLOSET FROM NORTH AT EAST WALL DOOR FRAME, 1st CLOSET FROM NORTH AT EAST WALL DOOR, 1st CLOSET FROM NORTH AT EAST WALL CEILING, WEST WALL, 1st WINDOW FRAME FROM SOUTH AT WEST WALL, CEILING, BASEBOARD AT EAST WALL IN THE 1st ROOM FROM NORTH AT WEST LOCATED AT APT A3, 1st STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION ''NORTHWEST''
Apt: A3
§ 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION AT 1st RISER FROM WEST AT NORTH WALL IN THE 2nd ROOM FROM NORTH AT WEST LOCATED AT APT A3, 1st STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION ''NORTHWEST''
Apt: A3
§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR ...AT CEILING AND ALL WALLS IN THE 2nd ROOM FROM NORTH AT WEST LOCATED AT APT A4, 1st STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION ''SOUTHWEST''
Apt: A4
§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR ...AT CEILING AND ALL WALLS IN THE 2nd PRIVATE HALLWAY FROM NORTH LOCATED AT APT A4, 1st STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION ''SOUTHWEST''
Apt: A4