Drop this scorecard into a tenant guide, blog post, or wiki. It updates itself as new violations are filed.
Brooklyn · February 2026
Best & worst months to sign a lease
Potential savings: ~9% by timing your move to February.
Asking rent per bedroom type — switch tabs to see each with effective (concession-net) rent.
Monthly counts over the last 7 years · all data sources
HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 3, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH
§ 27-2013 ADMIN. CODE: PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE 1st ROOM FROM NORTH AT WEST, THE 3rd ROOM FROM NORTH AT EAST, THE KITCHEN , THE FOYER , THE 3rd ROOM FROM NORTH AT WEST LOCATED AT APT 3, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH
Portfolio-level grade reflects the landlord's buildings across NYC, weighted by unit count. Individual building grades may differ.
View full landlord profileTop 1 by score · of 2 total
ACRIS deeds and regulatory filings
HPD Class B Violation — HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 3, 3rd STOR
HPD Class A Violation — § 27-2013 ADMIN. CODE: PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES
PAINT/PLASTER — WALL
UNSANITARY CONDITION — MOLD
SAFETY — WINDOW GUARD BROKEN/MISSING
WATER LEAK — HEAVY FLOW
Plumbing — Failure To Retain Water/Improper Drainage- (LL103/89)
General Construction/Plumbing — Wall/Retaining Wall - Bulging/Cracked
Request Large Bulky Item Collection
Request Large Bulky Item Collection