3 total
SCOPE OF WORK OCCURS IN THE GARAGE AS DEPICTED WITHIN THESE DESIGN DRAWINGS INCLUDING: CEILING CRACK REPAIR, BEAM CRACK REPAIR, CEILING REPAIR, WALL CRACK REPAIR, BEAM & SLAB REPAIR.
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED FOR NEW BUILDING AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION. LIVE LOAD 300 PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER # 33 OF THE 2014 CODE
STARRY- Installation of 3 new antenna sectors (24 antennas total), and 1 equipment cabinet on a wall mount. No change in use, egress, or occupancy. All in conformance with TPPN 5/98.