10 total
Installation of plumbing fixtures along with related piping. installation of 2 domestic water heaters and pumps.
structural work for new interior cold formed steel ramp at first floor common area.
Facade repairs. No change in egress, use or occupancy.
Facade Repair Via Suspended Scaffolding
INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. SHED SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
WORK SHALL INCLUDE DIRECT REPLACEMENT OF FINISHES DIRECT REPLACEMENT OF APARTMENT KITCHEN, BATHROOMS, DOORS AND WINDOW SASHES.
SCOPE OF WORK INCLUDES THE REPLACEMENT OF GAS BOILERS AND ASSOCIATED PIPING AND DUCTWORK.
MECHANICAL WORK INCLUDES INSTALLATION OF NEW GAS VENT DUCTS IN BOILER ROOM - EXISTING CHIMNEY - CELLAR LEVEL.
Installation of plumbing fixtures along with related piping.
Scope of work includes the repair and/or replacement of ventilation components and heating elements in bathroom/kitchen of existing apartments, as needed.