Back to building

655 BUSHWICK AVENUE— Violations & Issues

Loading chart data...

Top Violations

Door/Lock5
Smoke/CO Detector2
Paint/Plaster1

Top 311 Complaints

WATER LEAK4
UNSANITARY CONDITION3
PAINT/PLASTER2
Lead1
Noise - Residential1
Class B - HazardousVIOLATION DISMISSED

§ 27-2005, 2007 ADM CODE REMOVE ALL ENCUMBRANCES CONSISTING OF CONSTRUCTION MATERIALS AND HOUSEHOLD ITEMS AT PUBLIC HALL, 3rd STORY

Jun 14, 2021
Class B - HazardousVIOLATION DISMISSED

§ 27-2045 ADM CODE REPAIR OR REPLACE THE SMOKE DETECTOR INOPERATIVE LOCATED AT APT 3L, 3rd STORY, APARTMENT AT WEST

Apt: 3L

Dec 26, 2020
Class B - HazardousVIOLATION DISMISSED

§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE EAST WALL IN THE KITCHEN LOCATED AT APT 3L, 3rd STORY, APARTMENT AT WEST

Apt: 3L

Dec 26, 2020
Class C - Immediately HazardousVIOLATION CLOSED

§ 27-2044 ADM CODE ARRANGE AND MAKE SELF-CLOSING THE DOORS IN THE ENTRANCE LOCATED AT APT 3L, 3rd STORY, APARTMENT AT WEST

Apt: 3L

Dec 26, 2020
Class B - HazardousVIOLATION DISMISSED

§ 27-2046.1 HMC: REPAIR OR REPLACE THE CARBON MONOXIDE DETECTING DEVICE(S). INOPERATIVE LOCATED AT APT 3L, 3rd STORY, APARTMENT AT WEST

Apt: 3L

Dec 26, 2020
Class C - Immediately HazardousVIOLATION CLOSED

§ 27-2044 ADM CODE ARRANGE AND MAKE SELF-CLOSING THE DOORS AT VESTIBULE AT PUBLIC HALL, 1st STORY

Dec 22, 2020
Class C - Immediately HazardousVIOLATION CLOSED

§ 27-2044 ADM CODE ARRANGE AND MAKE SELF-CLOSING THE DOORS AT EAST ENTRANCE LOCATED AT APT 3L, 3rd STORY, APARTMENT AT NORTH

Apt: 3L

Dec 22, 2020
Class B - HazardousVIOLATION DISMISSED

§ 27-2005, 2007 ADM CODE REMOVE ALL ENCUMBRANCES CONSISTING OF BICYCLE AND HOUSEHOLD ITEMS AT PUBLIC HALL, 2nd STORY

Dec 22, 2020
Class B - HazardousVIOLATION DISMISSED

§ 27-2005, 2007 ADM CODE REMOVE ALL ENCUMBRANCES CONSISTING OF BICYCLES AND CONSTRUCTION MATERIAL AT PUBLIC HALL, 3rd STORY

Dec 22, 2020
Class B - HazardousVIOLATION DISMISSED

§ 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF PLEXI-GLASS PANEL INSTALLED AT VESTIBULE DOOR AT PUBLIC HALL, 1st STORY

Dec 22, 2020
1–10 of 12
page 1 / 2
Advertisement