648 HOWARD AVENUE— Violations & Issues
Top Violations
Top 311 Complaints
§ 27-2021 ADM CODE PROVIDE SUFFICIENT, PROPER AND SEPARATE METAL RECEPTACLES FOR THE DEPOSIT OF GARBAGE, RUBBISH AND OTHER WASTE MATERIAL AND ARRANGE FOR COLLECTION AND DISPOSAL OF SUCH MATERIAL.
HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 3E, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST
Apt: 3E
§ 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 3E, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST
Apt: 3E
§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD BASE CABINETS AT NORTH AND SOUTH WALLS IN THE KITCHEN LOCATED AT APT 1B, 1st STORY, 1st APARTMENT FROM SOUTH AT WEST
Apt: 1B
§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE DOOR AT ENTRANCE IN THE 2nd BATHROOM FROM NORTH LOCATED AT APT 1B, 1st STORY, 1st APARTMENT FROM SOUTH AT WEST
Apt: 1B
§ 27-2026 ADM CODE REPAIR THE LEAKY AND/OR DEFECTIVE FAUCETS AT BATHTUB IN THE 2nd BATHROOM FROM NORTH LOCATED AT APT 1B, 1st STORY, 1st APARTMENT FROM SOUTH AT WEST
Apt: 1B
§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE INTERCOM SYSTEM AT BUILDING FRONT TO RETURN BUZZER AT WEST WALL IN THE PRIVATE HALLWAY LOCATED AT APT 1B, 1st STORY, 1st APARTMENT FROM SOUTH AT WEST
Apt: 1B
§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC FLOOR TILES IN THE 1st BATHROOM FROM NORTH LOCATED AT APT 1B, 1st STORY, 1st APARTMENT FROM SOUTH AT WEST
Apt: 1B
§ 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE 1st BATHROOM FROM NORTH LOCATED AT APT 1B, 1st STORY, 1st APARTMENT FROM SOUTH AT WEST
Apt: 1B
§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE 1st BATHROOM FROM NORTH LOCATED AT APT 1B, 1st STORY, 1st APARTMENT FROM SOUTH AT WEST
Apt: 1B